BSC Changes identified as having no impact
CP1535 ‘Interconnector Fuel Type Category update to BMRS’
CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.
P451 ‘Updating BSC Black Start provisions and compensation arrangements’
P451 seeks to facilitate the implementation of NGESO’s new approach to Black Start, termed System Restoration. In doing so, it proposes to update all BSC references to “Black Start” to “System Restoration”, and enable contracted Restoration Service Providers who are non-BSC parties to claim BSC Black Start compensation.
You can join the P451 Workgroup as a voting member, a non-voting member or be added to the Workgroup mailing list. To sign-up, please fill out this form.
CP1571 ‘ another short title’
jgfjfgjf
CP1572 ‘A Shorter Title as per the guidelines’23
This is the page teaser section. Here is a very short summary of the subject. It should be approximately forty to fifty words long.2
P778’Mod title – test’
Page teaser about the mod
post title
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
CP1570 ‘Housekeeping amendments to include reference to ‘Asset Metering Virtual Lead Party’’
CP1570 is a Housekeeping change seeking to correct minor errors identified during the preparation for implementation of Approved Modification P375 ‘Settlement of Secondary Balancing Mechanism (BM) Units using metering behind the site Boundary Point’ as part of the June 2022 BSC Release.
P445 ‘Improving efficiency of Default Funding Share process and Energy Supply Company Administration’
This Modification seeks to allow the Funds Administration Agent (FAA) to process a Default Funding Share for unpaid Trading Charges earlier to reduce the cost of the borrowing facility and reduce the risk of shortfall. The Modification will also allow the Panel to instruct the FAA to release Trading Charges where the default relates to an Energy Supply Company Administration (ESCA).
P433 ‘P375-P420 Legal Text Alignment’
P433 seeks to ensure that the Legal Text for Approved Modification P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’ is aligned with the BSC baseline introduced by the implementation of P420 ‘Retail Code Consolidation Significant Code Review’. This Modification will correct a number of manifest errors introduced into the P375 legal text by P420 and will therefore allow the implementation of the P375 Legal Text in the BSC on the P375 Implementation Date.