BSC Changes impacting a Supplier

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a Supplier. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-9 of 9)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P451 ‘Updating BSC Black Start provisions and compensation arrangements’

P451 seeks to facilitate the implementation of NGESO’s new approach to Black Start, termed System Restoration. In doing so, it proposes to update all BSC references to “Black Start” to “System Restoration”, and enable contracted Restoration Service Providers who are non-BSC parties to claim BSC Black Start compensation.

You can join the P451 Workgroup as a voting member, a non-voting member or be added to the Workgroup mailing list. To sign-up, please fill out this form.

Read More

P778’Mod title – test’

Page teaser about the mod

Read More

P445 ‘Improving efficiency of Default Funding Share process and Energy Supply Company Administration’

This Modification seeks to allow the Funds Administration Agent (FAA) to process a Default Funding Share for unpaid Trading Charges earlier to reduce the cost of the borrowing facility and reduce the risk of shortfall. The Modification will also allow the Panel to instruct the FAA to release Trading Charges where the default relates to an Energy Supply Company Administration (ESCA).

Read More

P430: Allow Suppliers to use metering behind the site Boundary Point

P430 seeks to extend the solution to approved Modification P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’ to allow Suppliers to register Asset Meters and allocate Asset Metering System Identifier (AMSID) Pairs to Secondary Balancing Mechanism (BM) Units.

The Proposer believes this would address an unintended distortion in the market and enable the wider provision of Balancing Services to the system by enabling Suppliers to use metering equipment “behind” the defined Boundary Point for Settlement purposes.

The P375 solution will only allow Asset Metering Virtual Lead Parties (AMVLPs) to register Asset Metering Systems in order to obtain AMSID Pairs and to allocate those AMSID Pairs to Secondary Balancing Mechanism Units (SBMUs).

It is the Proposer’s view that the P375 solution is incomplete and should be extended to also apply to Suppliers to avoid a distortion in the market that gives one industry Party role an advantage over another, when both can provide Balancing Services from behind the Meter.

Read More

CP1542: Transfer de-energised site visits from Data Collector to Supplier

CP1542 proposes to transfer the obligation to visit de-energised sites annually from Data Collectors (DCs) to Suppliers for both the Non Half Hourly (NHH) and Half Hourly (HH) markets. This will require changes to procedures BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’ and BSCP504 ‘Non Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’. 

Read More

P419 ‘Enhanced Reporting of Demand Data to the NETSO to facilitate BSUoS Reform’

This Modification seeks to enable BSC Systems to aggregate the Import data of all non-Final Demand sites for exclusion from Balancing Services and Use of System (BSUoS) charges.

Read More

P417: Move credit templates and insurance products to the BSC Website

[page teaser field]This Modification seeks to remove the Letter of Credit templates and Approved Insurance Product requirements from annexes M1 – M4 of the BSC. The Modification also seeks to place a requirement on Elexon to publish the Letter of Credit templates and Approved Insurance Product requirements on the BSC Website. 

Read More

Short H1 title (CP1543)

Page Teaser: Traditionally, this is the where we would add content to the Page Teaser and it would appear on various landing pages

Read More

P429: Switching off Participant-Reported PARMS Serials

This Modification would cease the operation of, and remove the obligations associated with,
participant-reported Performance Assurance Reporting and Monitoring System (PARMS)
Serials and associated Supplier Charges.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or