Potential BSC changes awaiting initial consideration

Glossary

The BSC Change Backlog lists potential BSC Changes (Modifications, Change Proposals and Issues) that we believe will or may need to be raised.  

The Backlog may include changes that:

  • Are consequential changes needed as a result of another code change
  • We are developing on behalf of a BSC Committee or Issue Group; or
  • Have been brought forward by a participant and with whom we are supporting and playing critical friend to get it ready to raise

Considerations when viewing this report

  • An item appearing on the report is not a commitment to raise a Modification, Change Proposal or an Issue
  • The change type is only the expected progression route and is subject to change. The Panel or appropriate Panel Subcommittees are responsible for determining the progression routes for BSC changes
  • Modifications, Change Proposals and Issues may be raised that have not previously been included on this list.

Report key

Change Type

Meaning

Mod – DTRP

Modification Direct to Report Phase – No Workgroup

Mod – AP

Modification assessed by a Workgroup (Assessment Procedure)

CP

Change Proposal (subsidiary documents only)

Direction

Authority Led SCR Modification or direction from Secretary of State

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or