List of all BSC Change Proposals

These pages list all Change Proposals (CP) issued since 2010. These are detailed proposals which are raised to amend CSDs and/or BSC Systems, but would not alter the BSC. They must have a clear aim, a single defined solution and contain the relevant redlined documentation changes.

(Showing items 1-10 of 1017)

Show 10 | 20 | 50 | 100 | All

maria CP2

teaser

Read More

CP1572 ‘A Shorter Title as per the guidelines’23

This is the page teaser section. Here is a very short summary of the subject. It should be approximately forty to fifty words long.2 

Read More

CP1571 ‘ another short title’

jgfjfgjf

Read More

CP1570 ‘Housekeeping amendments to include reference to ‘Asset Metering Virtual Lead Party’’

CP1570 is a Housekeeping change seeking to correct minor errors identified during the preparation for implementation of Approved Modification P375 ‘Settlement of Secondary Balancing Mechanism (BM) Units using metering behind the site Boundary Point’ as part of the June 2022 BSC Release.

Read More

CP1560 ‘Demand Control Event Process Clarifications’

This CP seeks to clarify the processes that take place after a Demand Control Event by amending the relevant Code Subsidiary Documents to ensure clarity and consistency. 

Read More

Short H1 title (CP1543)

Page Teaser: Traditionally, this is the where we would add content to the Page Teaser and it would appear on various landing pages

Read More

CP1542: Transfer de-energised site visits from Data Collector to Supplier

CP1542 proposes to transfer the obligation to visit de-energised sites annually from Data Collectors (DCs) to Suppliers for both the Non Half Hourly (NHH) and Half Hourly (HH) markets. This will require changes to procedures BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’ and BSCP504 ‘Non Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’. 

Read More

CP1535 ‘Interconnector Fuel Type Category update to BMRS’

CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.

Read More

CP1523 ‘D0312 Process Alignment’

BSCP501 Amendments to clarify the D0312 process Current Status
Read More

CP1523 ‘D0312 Process Alignment’

Page teaser

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or