CP0643

Formal title: Modification P10 – Removing De Minimis Acceptances from the Calculation of SBP/SSP

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Awaiting Implementation
Implemented

Summary

Modification P10 – Removing De Minimis Acceptances from the Calculation of SBP/SSP
Amend the Imbalance Price (SBP/SSP) Calculations to exclude all Bid/Offer Acceptances with a volume less than a De-Minimis Acceptance Threshold (DMAT). The threshold to be set by the Panel, initially at 1 MWh.

Progression

This CP was implemented

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or