CP0774
Formal title: Definition of new SVA Manual Data Flow
Current Status
Summary
CP691 has incorporated a series of revised proving and validation rules in the Half Hourly Code Subsidiary Documents. One of the changes to BSCP502 relates to the situation where an HHDC detects a recorded energy in excess of the maximum permissible. If after sending a Metering System Investigation Request (D0001) to the Supplier there is no response, the HHDC applies the rules stated in section 4. 1 of BSCP502. As a result of CP691, HHDCs will now also notify BSCCo when such a problem has been detected and the Supplier has not given any advice on the matter. Although this new flow has been given a manual status, the flow itself has not been defined.
Progression
This CP was implemented