CP1099

Formal title: Requirements for Meter Type Compliance & Protocol App

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Awaiting Implementation
Implemented

Summary

BSCP601 specifies the requirements for new Meter types to be proven compliant with a relevant CoP (Compliance Testing) and the appropriate use of a metering Protocol for its collection of data (Protocol Approval).
This was drafted from the requirements of the Pooling and Settlement Agreement at a time when the only HH CoP existed. The intention of BSCP601 was to ensure that Settlement Metering (HH Metering) was proven appropriate for Settlement purposes. However, BSCP601 is silent with respect to the market that the Metering Equipment applies to and as a result applies equally to both HH and NHH Meters.

Progression

Implemented as part of the November 2005 Release.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or