CP1106

Formal title: Change to BSCP514 to bring it in line with BSCP504

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Awaiting Implementation
Implemented

Summary

BSCP504, Section 3. 2. 3 , step 3. 2. 3. 11 includes a requirement for the MOA to send the New NHHDC Meter Technical Details (MTD) within 1WD of a request for the MTD from the Old NHHDC via the D0170. This requirement is not mirrored in BSCP514 even though it is an obligation on the Meter Operator Agent (MOA).

Progression

Implemented as part of the November 2005 Release.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or