List of all BSC Standard Changes
This page list all Standard Changes published. Standard Changes (SC) are low risk, predictable and repeatable pre-authorised changes to the BSC or Code Subsidiary Documents (CSDs), that can be implemented without following the existing Change Proposal or Modification procedures.
[Showing 1 of 1]
SC0001 Removal of Footnote 3 in BSCP38
Currently footnote 3 in the BSCP38: Authorisations states: “First registration of authorised signatories must be via post, fax or e-mail from the company director. All subsequent changes may be via e-mail or the Self-Service Gateway from Category A Authorised Person.”
What is the proposed solution?
This change will be removing redundant text to a BSC Configurable Item. We are introducing a change to the Customer Solution where a Party can register their first Authorised Signatory using a digital signature that has been completed by a company director, rather than the need to do it via post, fax or email as previously required.
Who will this impact
BSC Parties completing Market Entry on the Customer Solution.
How to respond
Interested parties can submit an appeal against the implementation of this SC within 15 working days of the raised date 13 January 2025, with the appeal window closing on 3 February 2025. If no appeals have been raised during this period, SC0001 will be implemented on 27 February 2025 as part of a Standard Release.
Category: Housekeeping
Implementation Date: 27 February 2025
Last updated: 13 January 2025