Consultations on Operations and Settlement
This page lists all Consultations relating to Operations and Settlement. The consultations allow ELEXON to gather feedback from the industry about proposed changes so that any concerns are considered as part of our processes.
testing consultation appearing on homepage
Edited last updated date to 23/7/23
Consultation test 24/8/22
Teaser text
A new test consultation
Seeking views from industry on data requests received, prior to the Balancing Mechanism Reporting Service Change Board (BCB) making a determination on whether to release requested data.
LA test CAP consultation 25 June
Following an increase in forward market prices, a Credit Assessment Price (CAP) review was triggered. We invite Parties to indicate whether they agree with the proposal to increase the value of CAP to £77/MWh from last notified value of £70/MWh.
Xanda Test Post
We invite Parties to indicate whether they agree with the proposal to increase the value of CAP to £64/MWh from last notified value of £62/MWh.
Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group – 30 October 2019
ELEXON has received a new GSP registration application from the National Electricity Transmission System Operator. UK Power Networks are connecting two new circuits into the Richborough 132kV substation.
Consultation on the Market Index Definition Statement Review 2019
The Market Index Definition Statement (MIDS) defines the use of Market Index Data to calculate the Market Index Price (MIP), a price reflective of wholesale electricity for a Settlement Period in the short term market. An annual review of this document is required by the BSC, to ensure that the MIP is providing a reasonable reflection of the price of wholesale electricity in the short term market.
Changes were made to the MIDS as part of BSC Modification P377 ‘Amending Gate Closure references in Market Index Data’, which was implemented on 18 April 2019.
Our yearly analysis suggests that there are no further changes to the MIDS required at this time, with the current Individual Liquidity Threshold (ILT), timeband weightings and product weightings remaining suitable.
Response
Please respond using the consultation response proforma and send your responses, entitled ‘MIDS Review 2019 Consultation’, to [email protected] by Thursday 10 October 2019.
Responses to this consultation will be considered by the Imbalance Settlement Group at its meeting on 22 October 2019, where a final recommendation will be made to the BSC Panel for approval.
Credit Assessment Price (CAP) consultation: 9 September 2019
This consultation seeks respondents’ views on increasing the CAP £54/MWh from the last notified value of £43/MWh.
Response
Please email responses to [email protected] using the pro-forma below by 17.00 on Tuesday 17 September 2019.
P350 draft reference network mapping statement for Reference Year 2018-19
We issued a consultation on the draft reference network mapping statement for Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ to each Party. The network mapping statement is used for determining Nodal power flows in the calculation of Transmission Loss Factors.
Response
Please respond using the consultation response form and send your responses, entitled ‘P350 Draft Reference Network Mapping Statement’, to [email protected] by 17.00 on Friday 13 September 2019.
Changes to the CAP Review Process: 12 August 2019
We invite Trading Parties to indicate whether they agree with the proposal to set new CAP values based on the estimated reference price on the implementation date of the new CAP. We also invite Parties to indicate if they agree the trigger level (the value from which if the reference price deviates by, then a review of the CAP is triggered) should be automatically set. These proposed changes will allow for a more efficient process whilst maintaining the necessary levels of control.
Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group 21 June 2019
ELEXON has received a new GSP registration application from the Transmission Company. National Grid Electricity Transmission (NGET) is connecting a new GSP at Islington.
P350: Methodology for Load Periods and Sample Settlement Periods Consultation 19 June 2019
Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ introduced a Transmission Loss Factor (TLF) for each TLF Zone and BSC Season, so transmission losses can be allocated on a geographical basis. P350 went live on 1 April 2018.
This Consultation details the proposed methodology for setting Load Periods and Sample Settlement Periods to be used in the derivation of Zonal TLFs, as required by the Balancing and Settlement Code (BSC).
Response
We encourage you to respond to this consultation using the consultation pro-forma. The consultation period will end on Friday 5 July 2019 at 17:00. Please return responses to: [email protected].
At the end of the consultation period, ELEXON will consider all responses and, if required, update the methodology accordingly. The methodology, along with all consultation responses, will be presented to the Imbalance Settlement Group (ISG) meeting next month to request approval of both the methodology and actual LPs and SSPs.
Upon approval, ELEXON will publish the actual LPs and SSPs on the website on or before 31 August 2019.
Credit Assessment Price (CAP) consultation: 10 June 2019
This consultation seeks respondents’ views on decreasing the CAP £41/MWh from the last notified value of £48/MWh.
Response
Please email responses to [email protected] using the pro-forma below by 17:00 on Tuesday 18 June 2019.
DWG’s consultation on transitioning to Market-wide Half Hourly Settlement
The DWG has developed its approach for transitioning from the current Settlement arrangements to the Target Operating Model (TOM) for Market-wide Half Hourly Settlement (MHHS).
This consultation is your opportunity to comment on the transition approach as developed by the DWG, before Ofgem makes the final decision whether to approve it.
MHHS is a fundamental reform that will affect both existing and future participants in the energy market. The DWG therefore encourages views from all stakeholders.
Responses
Please email responses to [email protected] using the response form by 08:00 on 8 July 2019.
Further information
You can find more information about the DWG on the Design Working Group page of our website.
Credit Assessment Price consultation: 4 March 2019
Following a decrease in forward market prices, a Credit Assessment Price (CAP) review was triggered. We have issued a consultation paper on the value of the Credit Assessment Price.
We propose to decrease the value of CAP to £49/MWh from the last notified CAP value of £56/MWh.
DWG’s preferred TOM for Market-wide Half Hourly Settlement consultation
This consultation seeks views on the Target Operating Model (TOM) developed by the Design Working Group (DWG), before Ofgem makes the final decision on whether to approve it. Market-wide Half Hourly Settlement (MHHS) is a fundamental reform which will impact both existing and future participants in the energy market. The DWG therefore encourages views from all stakeholders.
Credit Assessment Price (CAP) consultation: 4 February 2019
This consultation seeks respondents’ views on decreasing the CAP to £56/MWh from the last agreed value of £68/MWh.
ELEXON has produced a set of data visualisation graphs that show the reference CAP and the live CAP and are used by ELEXON to support the regular CAP Review process.
- More on data graphs and calculating new CAP values
Response
Please email responses to [email protected] using the pro-forma below by 17:00 Tuesday 12 February 2019.
Credit Assessment Price Consultation 5 November 2018
We have issued a consultation paper on the value of Credit Assessment Price (CAP) . We invite Trading Parties to indicate whether they agree with the proposal to decrease the value of CAP to £68/MWh from its current approved level of £75/MWh.
Responses
You are invited to respond to this consultation using the consultation proforma. Please email your responses to [email protected] by 17:00 on Tuesday 13 November 2018.
Consultation on reducing CADL and DMAT parameters in 2018
We issued a consultation on the value of the pricing parameters De Minimis Acceptance Threshold (DMAT) and Continuous Acceptance Duration Limit (CADL). These parameters are used to classify and remove actions as part of the Imbalance Price Calculation.
We are proposing reducing CADL from 15 minute to 10 minutes and reducing DMAT from 1MWh to 0.1MWh.
- ELEXON Insights: What’s the impact of changing DMAT and CADL?
Responses
If you have any views on views on the CADL and DMAT review, please respond using the consultation response form and send your responses, entitled “CADL / DMAT Review 2018”, to [email protected] by 17:00 on Friday 9 November 2018.
Consultation on how to align BSC reporting with EMR Regulations
The Schedule of EMR Settlement Data (which was agreed by ELEXON, LCCC, ESC and EMRS in 2015) specifies that EMRS will be provided with a BM Unit Gross Demand Report, containing the gross demand data that EMRS requires in order to calculate the payments due from each licensed Supplier.
But, since then, ELEXON has become aware of two evolutions:
- In July 2017, BEIS and Ofgem published their joint Smart Systems and Flexibility Plan. This plan makes clear that BEIS and Ofgem now interpret the definition of ‘supply’ in the Electricity Act as meaning that the Supplier Obligation is not payable in relation to supply to premises occupied by a generator licence holder for the purpose of carrying out activities authorised under the generation licence, even if the generation is not ‘Licensable’.
- ELEXON has been approached by parties seeking to facilitate exempt supply (by the operators of community generation assets to local customers) under the class A supply licence exemption. Because this supply is not being made by a licensed Supplier it should not be subject to EMR charges, but currently the BM Unit Gross Demand Report sent to EMRS includes these volumes in the gross demand for the licensed Supplier who has registered metering on behalf of the exempt supplier.
The consultation document seeks views on how we should progress interim and enduring solutions to these issues. The BSC Panel will consider responses to the consultation at their meeting on 8 November 2018.
MIDS Review 2018 Consultation
The Market Index Definition Statement (MIDS) defines the use of Market Index Data to calculate the Market Index Price (MIP), a price reflective of wholesale electricity for a Settlement Period in the short term market. An annual review of this document is required by the BSC, to ensure that the MIP is providing a reasonable reflection of the price of wholesale electricity in the short term market.
Changes to the MIDS timeband descriptions are recommended following BSC Modification P342, which decoupled the Submission Deadline for Energy Contract Volume Notifications (ECVNs) and Metered Volume Reallocation Notifications (MVRNs) from Gate Closure. BSC Modification P342 was implemented in November 2017.
Response
Please respond using the consultation response form and send your responses, entitled ‘MIDS Review 2018 Consultation’ , to [email protected] by 17.00 on Monday 22 October 2018.
P350 draft reference network mapping statement for Reference Year 2017-18
We issued a consultation on the draft reference network mapping statement for Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ to each Party. The network mapping statement is used for determining Nodal power flows in the calculation of Transmission Loss Factors.
Response
Please respond using the consultation response form and send your responses, entitled ‘P350 Draft Reference Network Mapping Statement’, to [email protected] by 17.00 on Friday 14 September 2018.
Credit Assessment Price Consultation 28 August 2018
We issued a consultation paper on the value of Credit Assessment Price (CAP) . We invite Trading Parties to indicate whether they agree with the proposal to increase the value of CAP to £70/MWh from its current approved level of £59/MWh
Consultation for allocation of a new GSP to a GSP Group
ELEXON has received a new GSP registration application from the Transmission Company.
Southern Electric Power Distribution (SEPD) is connecting two new circuits into the existing East Claydon 132kV substation. This new Systems Connection Point will be registered in Settlement as a new GSP, to be known as East Claydon – Southern GSP (ECLA_H).
The Transmission Company propose that GSP ECLA_H is allocated to the Southern (_H) GSP Group.
A diagram showing the proposed change is included in the consultation document.
Responses
If you have any views on the allocation of the above GSPs to GSP Groups, please respond using the consultation response form and send your responses, entitled “East Claydon – Southern GSP Consultation”, to [email protected] by 17:00 on Tuesday 11 September 2018.
Credit Assessment Price Consultation 16 July 2018
We issued a consultation paper on the value of Credit Assessment Price (CAP). We invite Trading Parties to indicate whether they agree with the proposal to increase the value of CAP to £59/MWh from its current approved level of £53/MWh.
Outcome
The consultation closed on Tuesday 24 July 2018. All responses were in agreement with the proposed value and therefore, in accordance with the CAP Review Guidance, a Credit Committee meeting will not be held.
On Wednesday 15 August 2018, the CAP value will increase from £53/MWh to £59/MWh. As a result, Parties may notice a change in their Credit Cover Percentage, and should review the amount of Credit Cover lodged.
The CAP review trigger level value will remain at its current value of +/- £6/MWh.
P350: Consultation on Methodology for Load Periods and Sample Settlement Periods 19 June 2018
Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ introduced a Transmission Loss Factor (TLF) for each TLF Zone and BSC Season, so transmission losses can be allocated on a geographical basis. P350 went live on 1 April 2018.
This Consultation details the proposed methodology for setting Load Periods and Sample Settlement Periods to be used in the derivation of Zonal TLFs, as required by the Balancing and Settlement Code (BSC).
We encourage you to respond to this consultation using the consultation pro-forma. The consultation period will end on Tuesday 03 July 2018 at 17:00. Please return responses to: [email protected].
At the end of the consultation period, ELEXON will consider all responses and, if required, update the methodology accordingly. The methodology, along with all consultation responses, will be presented to the Imbalance Settlement Group (ISG) meeting in July to request approval of both the methodology and actual LPs and SSPs.
Upon approval, ELEXON will publish the actual LPs and SSPs on the website on or before 31 August 2018.
Credit Assessment Price Consultation 08 May 2018
A trigger event has occurred, meaning that the absolute difference between the CAP and the reference price is greater than the upper trigger level of £6/MWh. As a result, a consultation on a new CAP value has commenced. You are invited to respond to this consultation using the consultation proforma.
The consultation period will end on Tuesday 15 May 2018 at 17:00. Please return responses to [email protected].
Following the end of the consultation period, if required, the Credit Committee will try to meet on the week commencing 14 May 2018 to consider the responses, and decide whether to change the current CAP value and the trigger level.
Any change will be notified to all BSC Parties, and the new value will come into effect at least 15 Working Days later. If a Credit Committee meeting is not required at the end of the consultation period, the new CAP value of £53/MWh will be implemented on Thursday 7 June 2018.
Outcome
The consultation closed on Tuesday 15 May 2018. All responses were in agreement with the proposed value and therefore, in accordance with the CAP Review Guidance, a Credit Committee meeting will not be held.
On Thursday 7 June 2018, the CAP value will increase from £47/MWh to £53/MWh. As a result, Parties may notice a change in their Credit Cover Percentage, and should review the amount of Credit Cover lodged.
The CAP review trigger level value will remain at its current value of +/- £6/MWh.
DWG Consultation Skeleton Target Operating Models 2018
This consultation has been prepared by the Design Working Group to inform stakeholders about the skeleton TOMs and seeks your input on the design and evaluation work to date.
The TOM design work has been developed for Ofgem by the ELEXON-chaired Design Working Group. The Group has met monthly since October and produced five high level ‘skeleton’ TOM options, as set out in this consultation. We have approved the skeleton TOMs, concluding the first stage of the TOM design work.
The Design Working Group will now, through this consultation and a stakeholder seminar, seek stakeholder views on the skeleton TOMs to inform them as they proceed to stage 2, which is where the detailed design of the skeleton TOMs will be undertaken.
Consultation for Allocation of New Grid Supply Points to a GSP Groups
ELEXON has received three new GSP registrations application from the Transmission Company. All relate to the reconfiguration of existing assets.
Harris GSP and Stornoway GSP (North of Scotland)
There are two proposed new GSPs on the Scottish Western Isles, to be known as Harris GSP (GSP HARG_P) and Stornoway GSP (GSP STOR_P).
The Transmission Company propose that both GSP HARG_P and GSP STOR_P are allocated to the North of Scotland (_P) GSP Group.
Ferrybridge (Yorkshire)
NPG Yorkshire (YEDB) is the current Registrant of an existing Distribution System Connection Point (DSCP) (FERRB9) at Ferrybridge B 132kV substation. NPG Yorkshire intends to de-register the DSCP and instead register these circuits as a new GSP FERRB_M to feed the Yorkshire (_M) GSP Group.
The Transmission Company propose that GSP FERRB_M is allocated to the Yorkshire (_M) GSP Group.
Responses
If you have any views on the allocation of the above GSPs to GSP Groups, please respond using the consultation response form and send your responses, entitled “Harris, Stornoway and Ferrybridge GSP Registration”, to [email protected] by 17:00 on Monday 12 March 2018.
Generic Metering Dispensation Consultation: D/477
SP Manweb plc has applied for a lifetime generic Metering Dispensation (D/477). This consultation seeks views from Registrants and other interested parties. Responses will be considered by the Imbalance Settlement Group (ISG) and Supplier Allocation Group (SVG), who will decide whether to grant the Dispensation.
Data review for the Market Index Definition Statement – 2017
The Market Index Definition Statement (MIDS) defines the way the Market Index Price is calculated. We review the MIDS annually, as required by the Balancing and Settlement Code (BSC).
Our analysis shows that the current Individual Liquidity Threshold (ILT), timeband and product weightings remain suitable for 2017/18. We are seeking views on whether Parties agree that the current parameters should remain unchanged.
Credit Assessment Price (CAP) review consultation: 21 August 2017
We invite Trading Parties to indicate whether they agree with the proposal to increase the vaule of the CAP to £50/MWh from the last notified value of £43/MWh.
Changes to the CAP review process consultation: 18 April 2017
We invite Trading Parties to indicate whether they agree with the proposal to improve the efficiency of the process by automatically setting the CAP to the breached reference price unless at least one BSC Party or a Credit Committee member requests a meeting to be held. These proposed changes will allow for a more efficient process whilst maintaining the necessary levels of control around the CAP value.
Credit Assessment Price (CAP) review consultation: 20 March 2017
We invite Trading Parties to indicate whether they agree with the proposal to decrease the value of CAP to £44/MWh from its lastest approved level of £49/MWh.
Credit Assessment Price (CAP) review consultation: 13 February 2017
We invite Trading Parties to indicate whether they agree with the proposal to decrease the value of CAP to £52/MWh from its current level of £57/MWh.
Credit Assessment Price (CAP) review consultation: 10 January 2017
We invite Trading Parties to indicate whether they agree with the proposal to decrease the value of CAP to £57/MWh from its current level of £63/MWh.
Review of Metering Dispensations and non-standard BM Units
This consultation seeks respondent’s views on our recent review of Metering Dispensations and non-standard Balancing Mechanism (BM) Unit applications.
Credit Assessment Price (CAP) consultation: 29 November 2016
This consultation seeks respondents’ views on decreasing the CAP to £88/MWh from the last agreed value of £106/MWh. Please email responses to [email protected] using the profroma below by 17:00 Tuesday 6 December 2016.
MIDS Consultation
This Consultation relates to the update of the two Market Index Data Provider (MIDP) details in the Market Index Definition Statement (MIDS).
Credit Assessment Price (CAP) consultation: 8 November 2016
This consultation seeks respondents’ views on increasing the CAP to £110/MWh or a higher value between £120/MWh and £125/MWh from the last agreed value of £98/MWh. Please email responses to [email protected] using the profroma below by 17:00 Tuesday 15 November 2016.
Credit Assessment Price (CAP) consultation: October 2016
This consultation seeks respondents’ views on increasing the CAP to £68/MWh from the last agreed value of £53/MWh. Please email responses to [email protected] using the profroma below by 17:00 Tuesday 18 October 2016.
Credit Assessment Price (CAP) consultation: September 2016
This consultation seeks respondents’ views on increasing the CAP to £51/MWh from the current value of £42/MWh. Please email responses to [email protected] using the profroma below by 17:00 Tuesday 27 September 2016.
MIDS review 2016 consultation
The Market Index Definition Statement (MIDS) defines the way the Market Index Price – used to determine the ‘reverse’ Energy Imbalance Price – is calculated. We review the MIDS annually, as required by the Balancing Settlement Code (BSC).
Our analysis shows that the current Individual Liquidity Threshold (ILT), timeband and product weightings remain suitable for 2016/17. We are seeking views on whether Parties agree that the current parameters should remain unchanged.
Credit Assessment Price (CAP) consultation: August 2016
This consultation seeks respondents’ views on increasing the CAP to £42/MWh from the current value of £38/MWh. Please email responses to [email protected] using the profroma below by 17:00 Tuesday 16 August 2016.
Credit Assessment Price (CAP) consultation: June 2016
This consultation seeks respondents’ views on increasing the CAP to £37/MWh from the current value of £33/MWh. Please email responses to [email protected] using the profroma below by 17:00 Tuesday 21 June 2016.
Credit Assessment Price (CAP) consultation: February 2016
This consultation seeks respondents’ views on reducing the CAP to £33/MWh from the current value of £38/MWh. Please email responses to [email protected] using the profroma below by 17:00, Tuesday 1 March 2016.
Credit Assessment Price (CAP) process review consultation
This consultation seeks respondents’ views on on options to improve the CAP setting and implementation process. Responses will be presented to the Credit Committee at its March 2016 meeting.
Credit Assessment Price (CAP) Review Consultation
This consultation seeks respondents’ views on reducing the Credit Assessment Price (CAP) to £37/MWh from the current value of £42/MWh. The CAP is used in the Credit Cover calculation and a change to CAP can impact the amount of Credit Cover required by a Trading Party.
Risk Operating Plan (ROP) 2016/17 Consultation
This consultation asks respondents to review the Risk Operating Plan (ROP) 2016/17, and to submit any comments to [email protected] by 18 December 2015. Responses to this consultation will be presented to the Performance Assurance Board (PAB) meeting in February 2016.
If you have any questions on this document please contact Melinda Anderson on 020 7380 4019.
Data review for the Market Index Definition Statement 2015
Our yearly analysis shows that the current Individual Liquidity Threshold (ILT), timeband weightings and product weightings remain suitable for 2015/16. We are now seeking views on whether the MIDS will remain fit for purpose following implementation of a Single Imbalance Price in November 2015.
MIDS Review Consultation 2021
We are seeking your views on the annual Market Index Definition Statement (MIDS) review. If you represent BSC Parties or any other party in connection with the MIDS please respond to this online consultation.