Codes of Practice: Settlement Agreement for Scotland
The Codes of Practice are in relation to the Settlement Agreement for Scotland (“SAS”). ELEXON Limited is not responsible for the creation of the SAS Codes of Practice. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from use of this information or action taken in reliance on it.
In accordance with Section L of the BSC; a Metering System shall, as a minimum, comply with the requirements set out in the version of the Code of Practice relevant at the time the Metering System was first registered for Settlement.
The Codes of Practice are in relation to the Settlement Agreement for Scotland (“SAS”). ELEXON Limited is not responsible for the creation of the SAS Codes of Practice. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from use of this information or action taken in reliance on it.
In accordance with Section L of the BSC; a Metering System shall, as a minimum, comply with the requirements set out in the version of the Code of Practice relevant at the time the Metering System was first registered for Settlement.
Scottish S1 - Code of the Metering of Circuits with a rated capacity exceeding 100 MVA for Allocation purposes
Scottish S2 - Code of the Metering of Circuits with a rated capacity not exceeding 100 MVA for Allocation purposes
Scottish S3 - Code of the Metering of Circuits with a rated capacity not exceeding 10 MVA
Scottish S4 - Code for the calibration, testing and commissioning requirements of Metering Equipment for Allocation purposes
Scottish S5 - Code for the Metering of Circuits with a rated capacity not exceeding 1MW for Allocation purposes
Scottish S6 - Code for the Metering of Energy Imports via Low Voltage Circuits at 100 Amps or less per phase for Allocation purposes
Scottish S7 - Code for the Metering of Energy Imports via Low Voltage Circuits at 100 Amps or less per phase for Allocation purposes
Scottish S8 - Code of the Metering of Import Active Energy via Low Voltage Circuits for Non Half Hourly Allocation purposes