Glossary Term: Interconnector Scheduled Transfer
For each Interconnector in relation to a Settlement Period is the Active Energy flow, scheduled for all Interconnector Users (and not exceeding the physical capability of the Interconnector as from time to time determined under the relevant Interconnection Agreements), across the Interconnector (as a whole), as established pursuant to the relevant Interconnection Agreements between the Interconnected System Operator and the Externally Interconnected System Operator, stated as at the Transmission System Boundary, in the form of a schedule expressed as MW values for the spot times at the start and end of, and other spot times within, the Settlement Period; has the meaning given to that term in Section R7.1.3;