Glossary Term: Minimum Non-Zero Time

Acronym: MNZT

Has the meaning given to that term in BC1 of the Grid Code. Is the minimum time that a BM Unit can operate at a non-zero level as a result of a Bid-Offer Acceptance Also set of data supplied by the System Operator for publication on the BMRS, comprising for each BM Unit the effective time and the minimum non-zero time.

Suggest content changes

Glossary A-Z

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or