Registration of Systems Connection Points
A circuit at a Systems Connection Point must not be physically energised until ELEXON has issued an approval to energise it. This approval will be issued once all Settlement requirements have been completed and verified. This draws together flow diagrams and requirements set out in various BSCPs. It also contains checklists of the Licensed Distribution System Operators (LDSO) requirements for each type of Systems Connection Point.