P379 ‘Multiple Suppliers through Meter Splitting’

Formal title: Enabling consumers to buy and sell electricity from/to multiple providers through Meter Splitting

Current Status

Submission
Initial Written Assessment
Assessment Procedure
Report Phase
With Authority
Awaiting Implementation
Implemented

Summary

This Modification will enable individual consumers to be supplied by multiple Trading Parties through a Balancing and Settlement Code (BSC) Settlement Meter at the Boundary Point. It will amend the market rules to support development of non-traditional business models and innovation, expanding upon the solution to be implemented by BSC Modification P344 ‘Project TERRE implementation into GB market arrangements’. It will achieve this through the creation of a new Party Agent role, the Customer Notification Agent (CNA), who would reconcile power flows through the Settlement Meter, enabling accurate allocation of volumes and costs, which in turn will allow Trading Parties to reflect these volumes in their bills and payments to consumers.

This Modification is Proposed by New Anglia Energy, a recent BSC entrant who will be an Exempt Supplier, but the principle behind it has support from a range of BSC Trading Parties including OVO Energy and Cooperative Energy, and non-BSC parties, including Powervault and Verv.

Progression

The next P379 Meeting (WG10) will be held on 3 December 2019. The purpose of the meeting is to review the detailed P379 Business Requirements and agree next steps for Impact Assessment.

The last Workgroup meeting (WG9)  was held on 24 September 2019. At the meeting Ofgem presented on Key design considerations. The Workgroup reviewed the P379 high level Business Requirements, P379 Policy – Regulatory Log and complex use cases.  ELEXON is in the process of drafting the detailed Business Requirements to be reviewed by the WG at the next meeting to be held in November 2019.    

The P379 Interim Assessment Report was presented at the BSC Panel meeting on 13 June 2019. A copy of the Report can be found in the Documents section below. BSC Panel feedback will be provided at WG5.

P379 was raised on 3 January 2019, and the Initial Written Assessment (IWA) was presented to the BSC Panel at its meeting on 10 January 2019. The Panel progressed P379 to the Assessment Phase. The first Workgroup meeting for P379 was held on 27 February 2019. The group agreed the Terms of Reference and discussed views on the proposal.

All P379 Workgroup Material can be found at the below links

P379 Workgroup 1 – 27 February 2019

P379 Workgroup 2 – 3 April 2019

P379 Workgroup 3 – 18 April 2019

P379 Workgroup 4 – 21 May 2019

P379 Workgroup 5 – 27 June 2019

P379 Workgroup 6 – 23 July 2019

P379 Workgroup 7 – 24 July 2019

P379 Workgroup 8 – 13 August 2019

P379 Workgroup 9 – 24 September 2019

P379 Workgroup 10 – 3 December 2019

Next Events

The next P379 Workgroup meeting will be held on 3 December 2019.


My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or