Glossary

P402 ‘Reform of residual network charging’

P402 will introduce new reporting requirements on Licensed Distribution System Operators (LDSOs) and Elexon that will ensure the provision of data to enable the (National Electricity Transmission System Operator) NETSO to set Transmission Network Use of System (TNUoS) demand residual tariffs and enable accurate billing of subsequent charges.

Following the conclusion of its Targeted Charging Review Significant Code Review , Ofgem directed National Grid and certain  LDSOs to make changes to how residual revenues are recovered through Distribution Use of System (DUoS) and TNUoS demand charges. 

Current Status

Submission
Report Phase
Awaiting Implementation
Implemented

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or