Industry discussions identified that the full range of smart meter variants cannot currently support the replacement of Load Switching devices, which are used primarily by Suppliers to switch between registers on Meters. As a result, the RTS arrangements are still required for a time period beyond the current March 2020 end date for the RTS service.
A contract extension between the Energy Networks Association (ENA) and BBC has been agreed, enabling the continuation of the RTS service, that will apply from 1 April 2020 to 31 March 2021.
Energy UK has held discussions with the Supplier community regarding how RTS costs could be recovered for the extended contract (and potentially any further extensions), and the BSC was identified as the appropriate Code to include such cost recovery arrangements.
Potential Solution
Issue 84 Group considered:
Solution 1 – Utilising the existing RTS Contract between the ENA and ELEXON that is already in place, to facilitate the RTS cost recovery. Solution 1 could be delivered under:
- Option a) allowing for RTS costs to be delivered by total market share across all BSC Trading Parties.
Solution 2 – Raising a BSC Modification to introduce a requirement for the BSCCo to recover additional RTS costs from Suppliers under BSC recovery mechanisms. Solution 2 could be delivered through one of the below options:
- Option b) calculating costs proportionately across all Suppliers or;
- Option c) calculating costs by RTS User market share basis