P375 ‘Metering behind the Boundary Point’

Metering behind the Boundary Point

Formal title: Settlement of Secondary BM Units using metering behind the site Boundary Point

Current Status

Submission
Initial Written Assessment
Assessment Procedure
Report Phase
With Authority
Awaiting Implementation
Implemented

Summary

P375 proposes using Metering Equipment ‘behind’ the defined Boundary Point for Balancing Services (‘behind the Meter’), for Settlement purposes rather than the Boundary Point Meter.

This will allow balancing-related services on-site to be separated from imbalance-related activities, more accurately reflecting the balancing-energy volumes provided by the Balancing Service Provider (BSP).

P375 arose from Issue 70 ‘Settlement of Secondary BM Units using metering at the asset’.

Progression

The sixth Workgroup meeting was on 6 November 2019 – the summary note is below.

ELEXON are finalising business requirements alongside P379 and P376. We will then draft legal text, which we will share with the Workgroup.

the Impact Assessments are still being developed. 

Next Events

the next Workgroup will occur in January 2020, date TBC

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or