List of all BSC Change Proposals
These pages list all Change Proposals (CP) issued since 2010. These are detailed proposals which are raised to amend CSDs and/or BSC Systems, but would not alter the BSC. They must have a clear aim, a single defined solution and contain the relevant redlined documentation changes.
maria CP2
teaser
CP1572 ‘A Shorter Title as per the guidelines’23
This is the page teaser section. Here is a very short summary of the subject. It should be approximately forty to fifty words long.2
CP1571 ‘ another short title’
jgfjfgjf
CP1570 ‘Housekeeping amendments to include reference to ‘Asset Metering Virtual Lead Party’’
CP1570 is a Housekeeping change seeking to correct minor errors identified during the preparation for implementation of Approved Modification P375 ‘Settlement of Secondary Balancing Mechanism (BM) Units using metering behind the site Boundary Point’ as part of the June 2022 BSC Release.
CP1560 ‘Demand Control Event Process Clarifications’
This CP seeks to clarify the processes that take place after a Demand Control Event by amending the relevant Code Subsidiary Documents to ensure clarity and consistency.
Short H1 title (CP1543)
Page Teaser: Traditionally, this is the where we would add content to the Page Teaser and it would appear on various landing pages
CP1542: Transfer de-energised site visits from Data Collector to Supplier
CP1542 proposes to transfer the obligation to visit de-energised sites annually from Data Collectors (DCs) to Suppliers for both the Non Half Hourly (NHH) and Half Hourly (HH) markets. This will require changes to procedures BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’ and BSCP504 ‘Non Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’.
CP1535 ‘Interconnector Fuel Type Category update to BMRS’
CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.
CP1523 ‘D0312 Process Alignment’
CP1523 ‘D0312 Process Alignment’
Page teaser
CP1522 ‘Updates to BSCP520 to align with working practices and UMSUG recommendations’
CP1521 ‘BSCP70 Amendments for IA and IEA’
CP1520 Clarification to ‘Change of Ownership’ process in BSCP537
CP1519 ‘Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations’
CP1518: Housekeeping change to address errors in the approved changes to BSCP514 for CP1515
CP1517: Changes to BSC Configurable Items for the TERRE Final Implementation Date
CP1516: New Interconnector Fuel Type Categories: ElecLink & IFA2
CP1515: Faster Switching
CP1514: Number of register digits for smart Meters
CP1513: Inconsistencies in BSCP601, CoP3 and CoP5
CP1512: Improving the format of BSCP11 forms
CP1511: Configurable Items
CP1510: Allow the online management of registrations, Market Entry and Market Exit
CP1509: Amend BSCP503 to add new recipients of the D0355 data flow
CP1508: Updating standards in the CoPs and BSCP601
CP1507: Updates to BSCP520 to align with working practices
CP1506: New Interconnector fuel type
CP1505: Off site Commissioning of current transformers
CP1504: amend BSCP201’s references to dual/single pricing
CP1503: Changes to European Transparency Regulation data
CP1502
CP1501
CP1500
CP1499
CP1498
CP1497
CP1496: Data flows
Introduction of two new dataflows for Commissioning in the Metering System process for LDSOs, Suppliers and MOAs. Use of Data Transfer Network