List of all BSC Change Proposals

These pages list all Change Proposals (CP) issued since 2010. These are detailed proposals which are raised to amend CSDs and/or BSC Systems, but would not alter the BSC. They must have a clear aim, a single defined solution and contain the relevant redlined documentation changes.

(Showing items 1-1017 of 1017)

Show 10 | 20 | 50 | 100 | All

maria CP

teaser

Read More

CP1572 ‘A Shorter Title as per the guidelines’23

This is the page teaser section. Here is a very short summary of the subject. It should be approximately forty to fifty words long.2 

Read More

CP1571 ‘ another short title’

jgfjfgjf

Read More

CP1570 ‘Housekeeping amendments to include reference to ‘Asset Metering Virtual Lead Party’’

CP1570 is a Housekeeping change seeking to correct minor errors identified during the preparation for implementation of Approved Modification P375 ‘Settlement of Secondary Balancing Mechanism (BM) Units using metering behind the site Boundary Point’ as part of the June 2022 BSC Release.

Read More

CP1560 ‘Demand Control Event Process Clarifications’

This CP seeks to clarify the processes that take place after a Demand Control Event by amending the relevant Code Subsidiary Documents to ensure clarity and consistency. 

Read More

Short H1 title (CP1543)

Page Teaser: Traditionally, this is the where we would add content to the Page Teaser and it would appear on various landing pages

Read More

CP1542: Transfer de-energised site visits from Data Collector to Supplier

CP1542 proposes to transfer the obligation to visit de-energised sites annually from Data Collectors (DCs) to Suppliers for both the Non Half Hourly (NHH) and Half Hourly (HH) markets. This will require changes to procedures BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’ and BSCP504 ‘Non Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’. 

Read More

CP1535 ‘Interconnector Fuel Type Category update to BMRS’

CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.

Read More

CP1523 ‘D0312 Process Alignment’

BSCP501 Amendments to clarify the D0312 process Current Status
Read More

CP1523 ‘D0312 Process Alignment’

Page teaser

Read More

CP1522 ‘Updates to BSCP520 to align with working practices and UMSUG recommendations’

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1521 ‘BSCP70 Amendments for IA and IEA’

BSCP70 Amendments for Interconnector Administrator and Interconnector Error Administrator
Read More

CP1520 Clarification to ‘Change of Ownership’ process in BSCP537

Clarification to 'Change of Ownership' process in BSCP537
Read More

CP1519 ‘Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations’

Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations
Read More

CP1518: Housekeeping change to address errors in the approved changes to BSCP514 for CP1515

Housekeeping change to address errors in the approved changes to BSCP514 for CP1515
Read More

CP1517: Changes to BSC Configurable Items for the TERRE Final Implementation Date

Changes to BSC Configurable Items for the TERRE Final Implementation Date
Read More

CP1516: New Interconnector Fuel Type Categories: ElecLink & IFA2

New Interconnector Fuel Type Categories: ElecLink & IFA2
Read More

CP1515: Faster Switching

Meter Operator Agents to send Metering System Data to SMRS instead of ECOES for the Faster Switching Programme
Read More

CP1514: Number of register digits for smart Meters

Number of register digits for smart Meters
Read More

CP1513: Inconsistencies in BSCP601, CoP3 and CoP5

Updates removing inconsistencies within and between BSCP601, CoP3 and CoP5
Read More

CP1512: Improving the format of BSCP11 forms

Improving the format of BSCP11 forms
Read More

CP1511: Configurable Items

Clarification of BSCP40 definitions and processes
Read More

CP1510: Allow the online management of registrations, Market Entry and Market Exit

Allow the online management of registrations, Market Entry and Market Exit
Read More

CP1509: Amend BSCP503 to add new recipients of the D0355 data flow

Amend BSCP503 to add new recipients of the D0355 data flow
Read More

CP1508: Updating standards in the CoPs and BSCP601

Updating references to the British and International Standards within the relevant Code Subsidiary Documents.
Read More

CP1507: Updates to BSCP520 to align with working practices

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1506: New Interconnector fuel type

New Interconnector fuel type
Read More

CP1505: Off site Commissioning of current transformers

Allowing ‘off site’ Commissioning of current transformers preinstalled in cut outs or switchgear at manufacture for use in low voltage (LV) installations
Read More

CP1504: amend BSCP201’s references to dual/single pricing

Amend BSCP201’s references to dual/single pricing following implementation of P305
Read More

CP1503: Changes to European Transparency Regulation data

Changes to European Transparency Regulation data to align with latest ENTSO-e Manual of Procedures
Read More

CP1502

Removal of the requirement to submit sampling data for Profile Classes 5-8 following the implementation of P272
Read More

CP1501

Correction to P302 footnote in BSCP504
Read More

CP1500

Amend the BSCP537 Appendices to add a requirement for Suppliers and MOAs to demonstrate the ability to send and receive Smart Meter Configuration details
Read More

CP1499

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Suppliers on Meter Operation Code of Practice Agreement Accreditation for Meter Operator Agents
Read More

CP1498

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Meter Operator Agents on Meter Operation Code of Practice Agreement Accreditation
Read More

CP1497

Introduction of data flows for Half Hourly Meter Operator Agents to pass on Commissioning information when there is a Change of Agent
Read More

CP1496: Data flows

Introduction of two new dataflows for Commissioning in the Metering System process for LDSOs, Suppliers and MOAs. Use of Data Transfer Network

Read More

CP1495: Rejection response dataflow for a D0170

Introduction of a rejection response dataflow for a D0170 ‘Request for Meter System Related Details’ request from the Meter Operator Agent to the Licensed Distribution System Operator where a D0215 ‘Provision of Site Technical Details’ response is required.
Read More

CP1494

Introduction of an objection window for Housekeeping Change Proposals
Read More

CP1493

Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations
Read More

CP1492

Causes and treatment of large Line Loss Factors
Read More

CP1491

Lack of clarification surrounding the timeliness of Proving Tests and documentation for CVA MOA in BSCP02
Read More

CP1490

Changes to BSCP27 and Technical Assurance Agent Service Descriptions to remove constraints to service improvement
Read More

CP1489

Amendments to BSCP128 to align with BSCP68 timescales for LLF submissions for BM Units transferring from SMRS to CMRS and vice versa
Read More

CP1488

Align the NETA IDD spreadsheets with the live implementation of the SAA-I014 flow
Read More

CP1487

Remove the exclusion of Change of Measurement Classes in BSCP533 Appendix B
Read More

CP1486

Removing example Advice Notes, Backing Sheets and Confirmation Notices from BSCP301
Read More

CP1485

Validation of power transformer and cable/line loss adjustments
Read More

CP1484

Introduction of Additional SVAA Validation at SVA Run time
Read More

CP1483

Changes to BSCP550 – Shared Metering Arrangements
Read More

CP1482

Upgrade of NHHDA and EAC/AA systems from Oracle 11g to version 12c
Read More

CP1481

Housekeeping Change to BSCP536 following approval of P339
Read More

CP1480

Creation of a new authorisation category for corrections to BOA related data
Read More

CP1479

Updates to the Defined Metering Points in Codes of Practice 1, 2, 3, 5 and 10
Read More

CP1478

Automate the loading of the DF Matrix
Read More

CP1477

Updates to BSCP537 Appendix 1 as a result of P283
Read More

CP1476

Facilitation of Incremental LLFs
Read More

CP1475

Remove obligation to re-date final NHH Meter readings on CoMC
Read More

CP1474

CP1474 proposes to create new Change of Measurement Class processes for smart Meters.

Read More

CP1473

Changes to the Long Term Vacant Entry Criteria
Read More

CP1472

Removal of SVA proving tests for Meters with a pulse multiplier of one
Read More

CP1471

Alignment of the CRA URS to the NETA IDD
Read More

CP1470

Housekeeping Change to CoPs 1, 2, 3 and 5 following P266
Read More

CP1469

Changes to support the implementation of the SRAG’s recommendations
Read More

CP1468

Adoption of a standard template for raising Modifications
Read More

CP1467

Inclusion of site ID data within the BSCP11/07 'TDC Trading Dispute Findings' form
Read More

CP1466

Removing SMETS compliant Meters from the scope of BSCP601
Read More

CP1465

Sending revised MTDs following a change of NHHMOA
Read More

CP1464

Requiring HH consumption data to be processed to appropriate precision
Read More

CP1463

Process for ELEXON to calculate category 1 non-compliance materiality
Read More

CP1462

Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port
Read More

CP1461

Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions
Read More

CP1460

Timely inclusion of SBR Actions into imbalance cashout
Read More

CP1459

Amendments to the process for performing a Post-Final Settlement Run
Read More

CP1458

Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems
Read More

CP1457

Changes to BSCP520 to support the introduction of Generic LED Charge Codes
Read More

CP1456

Clarification to BSCP514 regarding the sending of Meter Technical Details on receipt of a D0170 data flow
Read More

CP1455

Sending revised Meter Technical Details following a change of Meter Operator Agent
Read More

CP1454

Amendment to the Category 1 Materiality Calculation
Read More

CP1453

Changes to SAA Service Description and SAA URS for P269 systems fix
Read More

CP1452

Aligning BSCP502 with amendments to the Electricity Supply Licence
Read More

CP1451

Allowing HH Default EACs for all HH Measurement Classes
Read More

CP1450

Security Requirements for CoP10 Metering Equipment
Read More

CP1449

Updates to BSCP520 and the SVA Data Catalogue following a review
Read More

CP1448

Changes to allowable software for Method 3 Proving Tests
Read More

CP1447

Amendment to the timescales for sending the D0010 from Supplier to NHHDC on a Smart Change of Supply event
Read More

CP1446

Allow smart CoS agreed Disputed Reads to be entered into Settlement
Read More

CP1445

BSCP516 alignment with revised P272 Implementation Date
Read More

CP1444

Extend the timescale of CoP10 Proving Tests until the implementation of P272
Read More

CP1443

Standard Settlement Configurations for smart and advanced Meters
Read More

CP1442

Clarifying the application process for Metering Dispensations
Read More

CP1441

Allowing the Peer Comparison technique to be reported on a Supplier Agent level
Read More

CP1440

Exempting Metering Systems in Measurement Class F from proving tests
Read More

CP1439

Proving Test Permissible Software
Read More

CP1438

Clarification of information required for raising a Trading Dispute
Read More

CP1437

Recommended amendments to BSCP68
Read More

CP1436

EAC/AA and NHHDA Applications – Windows Server upgrade
Read More

CP1435

Amendments to the SAA-I042 flow
Read More

CP1434

Amend the three digit numeric Line Loss Factor Class (LLFC) Id to an Alphanumeric LLFC Id
Read More

CP1433

Clarification of which Metering Systems are captured by the P272 requirements
Read More

CP1432

HH Default EAC by Measurement Class
Read More

CP1431

Extend Site Check Exemption to Measurement Classes F and G
Read More

CP1430

Clarification to the ECVN/MVRN processes
Read More

CP1429

Proving Test timescales
Read More

CP1428

Inclusion of Party Agents in the event of Post Final Settlement Runs
Read More

CP1427

Housekeeping change to BSCP503 for EMR
Read More

CP1426

Receipt of the D0296 flow at II
Read More

CP1425

Consequential changes to BSCP201 following EMR
Read More

CP1424

Amending the requirement for Data Aggregators to perform annual Full SMRS refreshes
Read More

CP1423

Amendments to BSCP68 following a review
Read More

CP1422

Add a Defined Metering Point for an Offshore Transmission Connection Point to the HH Codes of Practice
Read More

CP1421

Linking BSCP520 obligations to the Operational Information Document
Read More

CP1420

Allowance of mid-year LLF resubmissions due to material consumption or generation changes
Read More

CP1419

Improving data accuracy by enabling the D0312 flow to be sent on a Change of Supplier
Read More

CP1418

Validation of D0041 flows
Read More

CP1417

Reading validation for smart Meters
Read More

CP1416

Remotely disabled smart Meters
Read More

CP1415

Reading submission frequency for smart Meters
Read More

CP1414

Combining LDSO and Embedded LDSOs UMS Inventories on to single LDSO MSID
Read More

CP1413

Amendments to BSCP535 ‘Technical Assurance’ following a review
Read More

CP1412

Reporting of deleted BOAs within the SAA-I014 report
Read More

CP1411

Remove exemption from Proving Tests for Code of Practice 10 Metering Systems
Read More

CP1410

Transfer of Outstation Level 3 Passwords for advanced Meters
Read More

CP1409

Change of Measurement Class process for advanced Meters
Read More

CP1408

Excessively Large EAC/AA Control Points
Read More

CP1407

Updates to current LLF audit templates
Read More

CP1406

Electronic version of the Self Assessment Document
Read More

CP1405

Facilitating Faster Switching in the NHH Market
Read More

CP1404

Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points
Read More

CP1403

Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections
Read More

CP1402

Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract
Read More

CP1401

Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data
Read More

CP1400

Amendment of the System Energy flag via BSCP18
Read More

CP1399

Business Process Operations (BPO) Service rebranding
Read More

CP1398

Clarifications to BSCP520 ‘Unmetered Supplies registered in SMRS’
Read More

CP1397

Improvements to the Balancing Mechanism Reporting System (BMRS) Electricity Summary Page – Indicative Triad Demand Information tables
Read More

CP1396

Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process
Read More

CP1395

Distribution of Configuration Details for Smart Meters
Read More

CP1394

Use of SMETS compliant Meters for Profiling
Read More

CP1393

Technical Assurance - CDC Check
Read More

CP1392

BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).
Read More

CP1391

Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures
Read More

CP1390

New MDD Entity for SMETS Version
Read More

CP1389

Removal of Lux Meter Requirement for PECU Arrays
Read More

CP1388

Meter Technical Details for Smart Meters
Read More

CP1387

Clarifications to BSCP533 and Appendices
Read More

CP1386

Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent
Read More

CP1385

Notification of NHH Energisation Status Change by LDSO
Read More

CP1384

Clarification on disconnection and associated processes
Read More

CP1383

Upgrade of NHHDA and EAC/AA systems to Oracle 11g
Read More

CP1382

Clarification of IDD rules for leading zeroes
Read More

CP1381

Negative Wind Generation Forecast on BMRS
Read More

CP1380

Removing Agent Restrictions for Appointment of PRA Agent
Read More

CP1379

Service Review of the Technical Assurance of Metering Systems
Read More

CP1378

Alternative to CP1377 - Clarifying rules on Third Party Access on Licence Exempt Distribution Network
Read More

CP1377

Clarifying rules on Third Party Access on Licence Exempt Distribution Network
Read More

CP1376

Issues with Reporting Failed Instructions (D0023) Flows
Read More

CP1375

Increasing Material Impact Threshold
Read More

CP1374

Pre-site audit visits - Technical Assurance of Metering
Read More

CP1373

Uploading multiple ECVNs/MVRNs via the EWS
Read More

CP1372

Housekeeping Change to Demand BM Unit Example in BSCP75
Read More

CP1371

Removing requirements for Line Loss Factor Audit to be performed at the LDSO offices
Read More

CP1370

Revised rules for default LLF values
Read More

CP1369

Increased Flexibility in BSCP550 Data Splitting Algorithms
Read More

CP1368

Clarify/Resolve Operational Issues Related to Unmetered Supplies in SMRS
Read More

CP1367

Reporting Data relating to the East-West Interconnector on the BMRS
Read More

CP1366

Data Quality Obligations for Outgoing Supplier Agents
Read More

CP1365

Shortening Profile Production Timescales
Read More

CP1364

Remove BSC Systems constraint on maximum negative CALF values
Read More

CP1363

Addressing Settlement Data Adjustments in a Balanced Manner
Read More

CP1362

Removal of Residual Negative EACs
Read More

CP1361

Removal of Extreme EACs
Read More

CP1360

Inclusion of Audit Records for Gross Volume Correction and Dummy Meter Exchanges
Read More

CP1359

Introducing new products into the Market Index Definition Statement
Read More

CP1358

Change to timeband weightings in the Market Index Definition Statement
Read More

CP1357

Correction to MSID Allocation Process
Read More

CP1356

Demand BM Unit Aggregation Rule Example for BSCP75
Read More

CP1355

Update to BSCP537 Qualification Appendix 2: Testing Requirements
Read More

CP1354

Clarifying commissioning requirements of BSCP537 Qualification Appendix 1: Self Assessment Document (SAD)
Read More

CP1353

Including the ECOES Meter Information flow (D0312) in BSCP514
Read More

CP1352

Remove option of postal FAA invoices
Read More

CP1351

Improving Half Hourly Metering Equipment commissioning and storage of associated commissioning data
Read More

CP1350

Clarifying Meter Technical Details relating to Metering Systems that can be read remotely
Read More

CP1349

Changes to accommodate EU metering standards
Read More

CP1348

Supplier Charges following implementation of CP1334 'New PARMS Serials'
Read More

CP1347

Enhancements to SVAA Process for Distribution of Consumption Data for Embedded Networks
Read More

CP1346

Proving tests shall not be based on verbal Meter Technical Details
Read More

CP1345

Migration of interface between National Grid and BMRA/SAA/ECVAA from CSV to XML file format
Read More

CP1344

New PARMS Serials: Further Amendments to BSCP533 and BSCP533 Appendices
Read More

CP1343

Appropriate Line Loss Factors for High Voltage Customers metered at primary substations
Read More

CP1342

House Keeping Change to correct a Manifest Error in CoP9
Read More

CP1341

Unmetered Supplies: Accommodating Multi-Level Static Dimming Devices in Half-Hourly and Non-Half-Hourly Settlement
Read More

CP1340

Changes to BSCP537 Appendix 1 - Self Assessment Document (SAD) to better reflect the BSC Obligations
Read More

CP1339

Amendments to BSCP533 to enable changes to the hosting and operation of the PARMS system
Read More

CP1338

Guidance for Complex Sites - Network Flows affecting Settlement Meter Readings
Read More

CP1337

Improvements to the BSC Trading Disputes Process
Read More

CP1336

UMSO Adjustment of EACs and Pseudo HH Units based on Physical Audit Findings
Read More

CP1335

Mandating use of Auxiliary Meter Technical Details Data flow
Read More

CP1334

New PARMS Serials
Read More

CP1333

Improved Reporting of Prices for SO - SO Trades
Read More

CP1332

Addition of examples for Offshore generator Aggregation Rules to BSCP75
Read More

CP1331

Streamlining the Party & CVA Party Agent Registration Processes within BSCP65 and BSCP71
Read More

CP1330

Streamlining ELEXON's role in the delivery of the Registration Processes
Read More

CP1329

Amendment to the administration of the CVA Qualification process
Read More

CP1328

Changes to the ECVAA Web Service (EWS) request process
Read More

CP1327

Inclusion of a new MDD Entity 27 (Clock Interval) form in BSCP509
Read More

CP1326

Update to BSCP128 from lessons learnt exercise carried out with LDSOs
Read More

CP1325

Removal of Obsolete PARMS Serials
Read More

CP1324

Access Requirements for Offshore Metering Installations at 132kV or Above
Read More

CP1323

Review of the Qualification Self Assessment Document
Read More

CP1322

Review of the CSD Architectural Principles Document
Read More

CP1321

Housekeeping Change to correct a manifest error in BSCP301 and NETA IDD Part 2
Read More

CP1320

Replacement of erroneous Change of Supplier Readings
Read More

CP1319

Correction to table B4 of Appendix B in Code of Practice 4
Read More

CP1318

Minor changes to BSCP601
Read More

CP1317

Removal of requirement for NHHMOAs to notify NHHDCs of metering work before the event
Read More

CP1316

Removal from BSCP536 of obligation to attach a copy of Form 536/01 to BSCCo Bill
Read More

CP1315

Maintenance of Outstation Types as part of Compliance and protocol approval
Read More

CP1314

Housekeeping change to SAA Service Description
Read More

CP1313

Remove ELEXON from the Minimum Eligible Amount (MEA) request process
Read More

CP1312

Use of Gross Volume Correction in Post Final Settlement Runs
Read More

CP1311

Replacing Erroneous Forward Looking EAC
Read More

CP1310

Clarifications to Gross Volume Correction Process
Read More

CP1309

Include reference to D0303 in BSCP514 and circumstances in which its use is mandatory
Read More

CP1308

Changes to Long Term Vacant Site process where a reading is obtained via a warrant
Read More

CP1307

Minor Changes to the Long Term Vacant Site Process
Read More

CP1306

Removal of second criterion for identifying a site as a Long Term Vacant (LTV)
Read More

CP1305

Use of Site Visit Check Code (SVCC) 20 with additional information in the Long Term Vacant (LTV) process
Read More

CP1304

Exclusion of certain Site Visit Check Codes (SVCC) within the Long Term Vacant (LTV) site process
Read More

CP1303

Requirement on Half Hourly Data Collectors to Estimate Missing Reactive Power Demand Values
Read More

CP1302

Requirement on Half Hourly Data Collectors to Validate Reactive Power Demand Values
Read More

CP1301

Registration Requirements for System Connection Points Between Onshore Distribution Systems and Offshore Transmission Systems
Read More

CP1300

System changes to support Change of Market Participant ID for the SVA Agent and MDD Agent Roles from ‘CAPG’ to ‘SVAA’
Read More

CP1299

Requirement on Half Hourly Data Collectors to Collect and Report Reactive Power Data
Read More

CP1298

Requirement on MOAs to Configure Meters to Record HH Reactive Power Data
Read More

CP1297

Mandatory Capability to Record Reactive Power Demand Values in CoP10 meters
Read More

CP1296

Mandatory Capability to Record Reactive Power Demand (kvar) Values in Code of Practice 5 (CoP5) Meters
Read More

CP1295

Process for distribution of MDD Updates not included in D0269/D0270 flows
Read More

CP1294

Housekeeping Change to SVA Data Catalogue Volume 2
Read More

CP1293

Housekeeping changes to BSCP537 Appendix 1 - Self Assessment Document (SAD)
Read More

CP1292

Clarify Meter Administrator requirements relating to PECU arrays
Read More

CP1291

Clarify requirements on Meter Administrators relating to Equivalent Meters
Read More

CP1290

Rationalise and Simplify Unmetered Supplies requirements following a review by an Expert Group
Read More

CP1289

Correction to the Level 4 password requirement in Code of Practice 2
Read More

CP1288

Revisions to Meter test points within Code of Practice 4
Read More

CP1287

Correction of inconsistencies in BSCP536 ‘Supplier Charges’
Read More

CP1286

BSCP18 Operational Review: Additional flag in Transmission Company’s BOAL file to indicate an amended Bid-Offer Acceptance
Read More

CP1285

Unmetered Supplies: Clarification of Central Management System Requirements
Read More

CP1284

Ability for Third Parties to raise Change Proposals and replacement of energywatch with National Consumer Council.
Read More

CP1283

Revisions to data correction processes in BSCP18
Read More

CP1282

Maintenance of Outstation Types as part of Compliance and Protocol Approval
Read More

CP1281

Revenue Protection: requiring the NHHDC to send EAC/AA data to the Supplier via the DTC
Read More

CP1280

SVAA to provide LDSOs with aggregated consumption data for embedded Distribution Systems
Read More

CP1279

Housekeeping Change to BSCP515 – Licensed Distribution
Read More

CP1278

Streamlining the SVA Standing Data Change Process
Read More

CP1277

Change to UMS Charge code Approval Process
Read More

CP1276

Process following the Installation of Small Scale Third Party Generating Plant (Alternative to CP1260)
Read More

CP1275

Supplier Agents - Access to Meter Protocols
Read More

CP1274

Transfer of Meter Technical Details
Read More

CP1273

Changes to the scope of CoP10 to cover current transformer operated Meters
Read More

CP1272

Use of Appointment and Termination Flows in Unmetered Supplies (UMS)
Read More

CP1271

Align Market Domain Data Approval Timetable to SVG meetings
Read More

CP1270

Improvements to the Market Domain Data Process
Read More

CP1269

Publication of Additional Non Half Hourly Combination Data in Market Domain Data
Read More

CP1268

Publication of new Funds Administration Agent (FAA) Service Description
Read More

CP1267

Registration of UMSO’s and MA’s in SMRS
Read More

CP1266

Updates and Refinements to BSCP504
Read More

CP1265

Technical Assurance Documentation Changes Following Review
Read More

CP1264

Clarification of Password Requirements in the Codes of Practice
Read More

CP1263

Changes to Communication Requirements Document arising from Project Isis
Read More

CP1262

Service Improvements - Enhancements to the SVA Applications
Read More

CP1261

Introducing Metering Code of Practice 10 to facilitate smart metering in the Half Hourly (HH) market
Read More

CP1260

Meter Investigation Process where a Site is capable of Exporting (microgeneration)
Read More

CP1259

Distributor-Supplier Notification where a Site is capable of Exporting (microgeneration)
Read More

CP1258

Changes to BSCP520 Following Walkthrough
Read More

CP1257

Calculation of EAC for Temporary Supplies
Read More

CP1256

Action on Backdated D0052 Flows
Read More

CP1255

Service Descriptions and other CSD Inconsistencies
Read More

CP1254

Prevention of Unauthorised Access to AMR / Smart Meters
Read More

CP1253

Remote Reading Assurance
Read More

CP1252

Reading Submission Frequency for AMR Meters
Read More

CP1251

Ensuring Inferior / Inappropriate Peripheral Devices not used to Collect AMR Reads
Read More

CP1250

Increase opportunity to update the NMTES
Read More

CP1249

Correcting MDDM and SVAA Terminology
Read More

CP1248

Early release of Meter Technical Details by Non Half Hourly Meter Operator Agent
Read More

CP1247

BMRS Amendments to Report Interconnector
Read More

CP1246

A New Interface from BMRS to the ETSOVista Reporting System
Read More

CP1245

Communication of Data Estimations and Substitutions for Central Volume Allocation Metering Systems
Read More

CP1244

Remove Authorisation Categories ZB & ZC from BSCP38 and amend BSCP537
Read More

CP1243

Mandating HHDC checks on quality of Meter Technical Details
Read More

CP1242

Movement of the functional requirements within PSL180 CVA Meter Operation into BSCP06
Read More

CP1241

Clarification of Interest payments by Non-Paying BSC Debtors
Read More

CP1240

Reinforcement of the legal status of the Qualification Service Provider under the BSCP537 Qualification Letter
Read More

CP1239

Registration of Non Standard BM Units
Read More

CP1238

Requirement to mandate compliance testing for Meters and Outstations
Read More

CP1237

Movement of functional requirements in PSL160 to BSCP501 following the creation of generic non-functional PSL100
Read More

CP1236

Clarification of De-Energised and Disconnection Processes - Obligations under BSCP 515
Read More

CP1235

Movement of Functional Requirements in PSL150 (‘Half Hourly Data Aggregation’) to BSCP503 following the creation of PSL100 for generic non functional requirements.
Read More

CP1234

Movement of the functional requirements within PSL110 to BSCP514 and BSCP550, following the creation of a generic non functional PSL (PSL100) via CP1182.
Read More

CP1233

Transfer of the NHHDA functional requirements from PSL140 to BSCP505
Read More

CP1232

Clarification of Technical Requirements for CoP2
Read More

CP1231

Housekeeping Change to BSCP15
Read More

CP1230

Movement of the functional requirements within PSL120 to BSCP504, following the creation of a generic non functional PSL (PSL100) via CP1182
Read More

CP1229

Effective Date Validation in the D0052
Read More

CP1228

CRA Service Description Re-write
Read More

CP1227

AFYC Recalculation
Read More

CP1226

Amendment to the ‘Investigate inconsistencies’ section of BSCP504 to comply with DTC configuration
Read More

CP1225

Review of D0215 ‘Provision of Site Technical Details’ and surrounding processes
Read More

CP1224

The Review of Code of Practice 4
Read More

CP1223

Inconsistencies within the Code Subsidiary Documents regarding Business Requirements
Read More

CP1222

Inconsistencies within the SAA Service Description and URS
Read More

CP1221

Inconsistencies within the ECVAA Service Description
Read More

CP1220

Inconsistencies within the BMRA Service Description
Read More

CP1219

Inconsistencies within the CDCA Service Description and URS
Read More

CP1218

Movement of the functional requirements within PSL 170 Meter Administrator to BSCP520 Unmetered Supplies Registered in SMRS, following the creation of a generic non functional PSL via CP1182
Read More

CP1217

Discontinuing the BMRS High Grade Website
Read More

CP1216

Changes to Section 3.1 of BSCP509 to reflect a new process for the acceptance of the Profile Administrator (PrA) Technical Product Deliverables (TPDs) for inclusion in the Market Domain Data (MDD)
Read More

CP1214

Removal of PSL130 ‘Half Hourly Data Collection’ following the creation of a generic non functional PSL via CP1182
Read More

CP1213

Improvement to Proving Test process - Audit trail
Read More

CP1212

Improvements to BSCP27 identified during operational use.
Read More

CP1211

Changes to Codes of Practice 3, 5, 8 and 9 fusing requirements
Read More

CP1210

Housekeeping changes to re-baseline November 2007 Release documents to reflect the P197 and P207 Releases
Read More

CP1209

Inclusion of MSId Counts on the GSP Group Consumption Totals Report
Read More

CP1208

Changes to the Change of Profile Class Process set out in BSCP516
Read More

CP1207

D0095 reporting in respect of past NHHDCs
Read More

CP1206

D0095 reporting of immaterial Supplier inconsistencies
Read More

CP1205

D0095 reporting of immaterial superfluous consumption
Read More

CP1204

New charging code structure for Unmetered Supplies
Read More

CP1203

Replacement of the ‘Accuracy Requirements’ Tables in the Compliance Testing Appendix to BSCP601
Read More

CP1202

Changes to Meter Protocol Test Specification and the inclusion of BSCP601 appendices
Read More

CP1201

Changes proposed following Operational Review of BSCP15 'BM Unit Registration and BSCP20 Registration of Metering Systems For Central Volume Allocation'
Read More

CP1200

Removal of requirement for Proving Test Out of Timescale Escalation Report
Read More

CP1199

Changes to BSCP515 Licensed Distribution to remove non functional information and add clarity
Read More

CP1198

Changes to BSCP14 'Processing of Manifest Error Claims' to comply with the BSC
Read More

CP1197

Clarification of Grid Supply Point (GSP) and GSP Group Aggregation Rules
Read More

CP1196

Changes to incorporate Central Management Systems in Unmetered Supplies arrangements
Read More

CP1195

Amendments to BSCP27 ‘Technical Assurance of Half Hourly Metering Systems for Settlement Purposes’ and BSCP38 ‘Authorisations’ with regard to Category I Authorised Signatories
Read More

CP1194

Publication of Authorised Person’s data on the BSC website.
Read More

CP1193

Recommended changes following an operational review of BSCP38 – ‘Authorisations’
Read More

CP1192

Changes to the Investigate Inconsistencies processes in BSCP502 and BSCP514 (Half Hourly only)
Read More

CP1191

Amendment of SVAA Service Line SSL330 to bring it in line with current contract arrangements.
Read More

CP1190

Recommended Changes following an Operational Review of MDD Processes
Read More

CP1189

Change to allow SVA Line Loss Factors less than one
Read More

CP1188

Improvements to the use of the Half Hourly Aggregation Exception Report (D0235)
Read More

CP1187

UNIX Upgrades for NHHDA and EAC/AA
Read More

CP1186

Changes to the Profile Administrator (PrA) Service Description
Read More

CP1185

Allowing a Reading to be Deemed where an Actual Reading is Unavailable on a Change of Standard Settlement Configuration
Read More

CP1184

Disconnection of Energised Metering Systems
Read More

CP1183

Allowing a date to be deemed for a change in Energisation Status of a Half Hourly Meter
Read More

CP1182

Creation of a generic Party Service Line
Read More

CP1181

Removal of duplication between the SVA Data Catalogue and the DTC
Read More

CP1180

Confirmation of Metering Status in the Non Half Hourly Market
Read More

CP1179

Change to SP08 validation rules in PARMS
Read More

CP1177

Changes to the change of Profile Class process as set out in BSCP516 'Allocation of Profile Classes and SSCs for Non-Half Hourly SVA Metering Registered in SMRS'
Read More

CP1176

Additions to the February 2007 Release Housekeeping changes - removal of workflow diagrams from BSCPs
Read More

CP1175

Revision of BSCP 601 - Appendix 'Specification Compliance Testing Codes of Practice One, Two, Three and Five'
Read More

CP1174

Changes to BSCP601 and Compliance Test Specification
Read More

CP1173

Proving Test Out of Timescale Escalation Report
Read More

CP1172

Housekeeping CP for the February 2007 BSC Systems Release
Read More

CP1171

Improvements to the Proving Process
Read More

CP1170

Improving the BSC Change Process
Read More

CP1169

Within Day Dis-application of Energy Contract Volume Notifications
Read More

CP1168

Deemed Readings following Change of Measurement Class
Read More

CP1167

Clarification of Section 1.2 of SVA SSL310 ‘Daily Profile Production’
Read More

CP1166

Changes to allow use of inbound communications for CoP5 Metering
Read More

CP1165

Removal of the Requirement to Report Valid Excessive AA’s to Suppliers on a Daily Basis
Read More

CP1164

Improvements to BSCP27 identified during operational use with respect to Meter Technical Details and other supplementary information.
Read More

CP1163

Requesting Meter Technical Details during a change of Meter Operator Agent
Read More

CP1162

Sending revised Meter Technical Details during a change of Meter Operator Agent
Read More

CP1161

Housekeeping changes to the Communication Requirements Document
Read More

CP1160

Recommended changes following an operational review of the CVA Qualification requirements
Read More

CP1159

Confirmation of Metering status in the Half Hourly Market
Read More

CP1158

Inclusion of UMS Operational Data in MDD
Read More

CP1157

Initial Confirmation of D0265 Receipt
Read More

CP1156

Remove PAA as a recipient of BSCP507/1
Read More

CP1155

UMS-related Data Flows in the SVA Data Catalogue
Read More

CP1154

Amendment to form BSCP15/4.1
Read More

CP1153

Changes to the Meter Advance Reconciliation Processes as detailed in BSCP05
Read More

CP1152

Removal of requirement for the CDCA to approve work on CVA metering systems
Read More

CP1151

Late Comment on Clarity of the P183 changes to BSCP504 Step 3.2.6.8
Read More

CP1150

MDD Registration Principles
Read More

CP1149

NHHDA software does not support reporting to Suppliers
Read More

CP1148

Removing Section 4.6 from BSCP520
Read More

CP1147

Clarification of requirements for HH de-energised Meters
Read More

CP1146

Clarification of timescales for SMRS Refreshes
Read More

CP1145

Removal of requirements to register readings part 3
Read More

CP1144

Removal of requirements to register readings part 2
Read More

CP1143

Removal of requirements to register readings part 1
Read More

CP1142

Changes to the Proving Test Process
Read More

CP1141

Revision to Apportionment form F536/02 in BSCP536
Read More

CP1140

Removal of ECVNs/MVRNs from ECVAA for a Party in Default
Read More

CP1139

Housekeeping CP for SVA November 05 Release
Read More

CP1138

The Identification and Labelling of Meter Registers
Read More

CP1137

NHHDA Browse Activity Statuses access
Read More

CP1136

Extension of related common MTCs
Read More

CP1135

Inclusion of Erroneously Large EAC and AA Reporting Tool into the NHHDA software
Read More

CP1134

Clarification of Meter Reading History Interface on CoS
Read More

CP1133

Mechanism for NHHDC to Obtain Meter Reading History
Read More

CP1132

Minor enhancements to the P176 detailed solution
Read More

CP1131

Changes to FAA Documentation
Read More

CP1130

Inconsistency between BSCP507 and BSCP38
Read More

CP1129

Clarification for Parties to re-initiate BSCP38 process.
Read More

CP1128

Changes to BSCP301, 'Clearing, Invoicing and Payment'
Read More

CP1127

Inconsistencies within the SVA Data Catalogue
Read More

CP1126

NHH Instruction Processing Specification includes errors
Read More

CP1125

Submission of the D0028 over the Data Transfer Network
Read More

CP1124

Alternate methods of validation during NHH CoS Process
Read More

CP1123

Use of Early Readings during the NHH CoS Process
Read More

CP1122

Backstop Process as part of the CoS Process into CSD's
Read More

CP1121

Defect in NHH Aggregation Rules
Read More

CP1120

Amend Trading Query Deadline for SVA HH Queries
Read More

CP1119

Amend BSCP11 regarding precautionary Trading Queries
Read More

CP1118

Clarification of the Trading Query end-date
Read More

CP1117

Upgrade of NHHDA and EAC/AA systems to Oracle 10g.
Read More

CP1116

Upgrade of SVA System and SVA Agent Applications to Oracle 10g
Read More

CP1115

Authorisation View when using the P98 Web Reporting Service
Read More

CP1114

Ability to Cut and Paste using the P98 Web Reporting Service
Read More

CP1113

Acknowledgement when using the P98 Web Reporting Service
Read More

CP1112

Changes to BSCP32 following operational review.
Read More

CP1111

GSPGCF Relocation
Read More

CP1110

Amendments to PARMS Response Files
Read More

CP1109

Changes to BSCP38 for multiple Authorisation Applications
Read More

CP1108

Simplification of CoBO Process for CVA BM Units
Read More

CP1107

Timescale change to the 100kW notification from NHHDC
Read More

CP1106

Change to BSCP514 to bring it in line with BSCP504
Read More

CP1105

Prepayment Flows related to Settlement - Change CSDs
Read More

CP1104

BSCP520 inconsistent with North Scotland GSP Group
Read More

CP1103

BSCP533, 534, 536 changes due to Phase 3 & 4 of PARMS
Read More

CP1102

Sending of the D0052 by Unmetered Supplies Operators
Read More

CP1101

Allowing the use of IF Statements - CVA Metering Systems
Read More

CP1100

Removal of Metering Dispensations from CoPs 3 and 5.
Read More

CP1099

Requirements for Meter Type Compliance & Protocol App
Read More

CP1098

Removal of 'Pool Requirements of the DTS Network'
Read More

CP1097

Changes to validate format of SSC Id and TPR Id
Read More

CP1096

Confirmation of Energisation and Metering status
Read More

CP1095

Provision of the Complex Site Supplementary Information
Read More

CP1094

Change to BSCP503 to include HH flow to Supplier
Read More

CP1093

Failure to Submit Valid Standing Data Relationships
Read More

CP1092

Untraded Report Obligations
Read More

CP1091

Housekeeping Changes to Settlement Documentation
Read More

CP1090

Provision of Actual Energy values on SD basis for PARMS
Read More

CP1089

Inappropriate reporting of E03 & E04s on D0095 Report
Read More

CP1088

Inclusion of PARMS Response files in BSCP533 Appendix
Read More

CP1087

Consolidation of PARMS Report Details
Read More

CP1086

Change HHDC requirements following Failed Proving Test
Read More

CP1085

'underpin' process in PSL120
Read More

CP1084

Amendments to delivery of Peer Comparison Reports
Read More

CP1083

Removal of Umetered Supplies from BSCP520
Read More

CP1082

Replace reference to 'EASL' with 'Teleswitch Agent'
Read More

CP1081

EAC/AA Changes to Deemed Meter Advance Calculation
Read More

CP1080

Supplier and LDSO controls on Unmetered Supplies
Read More

CP1079

NHHDC obligations regarding UMSO-provided EACs
Read More

CP1078

Application of VAT to Trading Charges.
Read More

CP1077

Review of BSCP 40 Emergency Fix Procedure
Read More

CP1076

Incorporation of the content of BSCP76
Read More

CP1075

Clarification of Stakeholder input
Read More

CP1074

Greater structure and certainty with CP progression
Read More

CP1073

Introduction of a Housekeeping Process into BSCP40
Read More

CP1072

Data Estimation Method in D0022 Flow
Read More

CP1071

Amendment of SVAA and PARMS decimal place issue
Read More

CP1070

Changes to CSDs for correct usage of D0002 Flow
Read More

CP1069

Qualifying the Right of BSC Agents to Raise CPs
Read More

CP1068

Change to HHDC reports when there is no Proving Test
Read More

CP1067

Amendments to BSCP601
Read More

CP1066

Changes to SVAA Service Lines for Re-procurement
Read More

CP1065

Amendments to Code of Practice 8
Read More

CP1064

Flows to be send on a NHH change of Energisation Status
Read More

CP1063

Changes to the Investigate Inconsistencies processes in BSCP502, BSCP504 and BSCP514
Read More

CP1062

Clarification of the use of Defined Terms within BSCP 27
Read More

CP1061

Rationalisation of Interface Documents
Read More

CP1060

Providing Registrant with visibility of LLF
Read More

CP1059

Upgrade of NHHDA and EAC/AA under Oracle Forms 9i
Read More

CP1058

Update to Profile Administrator Service Description
Read More

CP1057

Request for Additional Market Indicator Data
Read More

CP1056

Additional Authorisation Category for Entry Processes
Read More

CP1055

Withdrawal of BSCP506
Read More

CP1054

Inaccurate Interface Timetables in BSCP06 3.1 and 3.2
Read More

CP1053

Upgrade of the SVAA software application for forms 9i
Read More

CP1052

Upgrade of NHHDA and EAC/AA software applications
Read More

CP1051

Review of Metering Code of Practice: 2
Read More

CP1050

CDCA MAR Discrepancy Values
Read More

CP1049

BSCP to enable the obligations on a LDSO and TSO
Read More

CP1048

Request MS history via D0170 upon Change of HHDC
Read More

CP1047

Warning to highlight when no GSP are selected for run
Read More

CP1046

Inconsistency between the BSC and BSCP535
Read More

CP1045

Data requirement for sending MS history on request
Read More

CP1044

Clarification of data requirements in the transfer of MS
Read More

CP1043

Reporting MAR overdue status by HHDC in monthly report
Read More

CP1042

Clarification on the MAR tolerance calculation
Read More

CP1041

Changes to BSCP509 following Operational Review
Read More

CP1040

Improvements to BSCP31
Read More

CP1039

Use of D0052 on change of Supplier / change of NHHDC
Read More

CP1038

Optional Data Items in D0052 Flow
Read More

CP1037

Timing and Validation of D0052 flow
Read More

CP1036

Rejection Flow for D0052
Read More

CP1035

Consumption not 'E' flagged following proving test failure
Read More

CP1034

Timing of D0170 data request flows
Read More

CP1033

Discrepancy between D0269 and D0270 flows
Read More

CP1032

Review, revision and clarification of BSCP11
Read More

CP1031

Entry Process Testing - Clarification for Party Agents
Read More

CP1030

Publishing of the details of Suppliers who meet criteria
Read More

CP1029

Enhancement to BPM to allow references
Read More

CP1028

Withdrawal of Supplier Hubs
Read More

CP1027

Revision to registration period for Metering Systems
Read More

CP1026

P62 Compliance and Issues Registering Metering
Read More

CP1025

Correction of existing process within BSCP514
Read More

CP1024

Amendment to BSCP11
Read More

CP1023

Inconsistent use of terminology in the TAA SD
Read More

CP1022

SSC changed without recalculation of EAC by NHHDC
Read More

CP1021

Allocation of Metering Systems
Read More

CP1020

Clarification of Pre Payment Meter reading obligations
Read More

CP1019

Clarification of Pre-Payment Meter reading Obligations
Read More

CP1018

Correction of formatting in BSCP76
Read More

CP1017

SAA and SVAA Settlement Calendars
Read More

CP1016

Monthly D0095 report from NHHDA software for P99
Read More

CP1015

BSCP15 Review
Read More

CP1014

NHHDA E03/E04 Exceptions
Read More

CP1013

Should a NHHDA E14, or E08, CDCD exception be raised
Read More

CP1012

Multiple NHHDA CDCD exceptions being reported to DC's
Read More

CP1011

Correction of Price Derivation Codes
Read More

CP1010

Incorrect footnote reference in BSCP504
Read More

CP1009

ECVAA Processing of Authorisation Requests
Read More

CP1008

Removal of obligation to raise ARs in BSCP40
Read More

CP1007

Revisions to Entry Process Requirements post P62
Read More

CP1006

Revised NHHDA archiving system parameters default val
Read More

CP1005

SVA Data Catalogue Vol 2: 'MTC Common Code Indicator'
Read More

CP1004

SVA Data Catalogues: corrections to 'Related Docs'
Read More

CP1003

SVA Data Catalogue: Correction of "Host LDSO Name"
Read More

CP1002

Change to BSCP40 to allow Energywatch to raise CPs
Read More

CP1001

Improvements to the NHHDA application
Read More

CP1000

Removal of BSCP20/4.5 and amendment of BSCP02/4.4.
Read More

CP0999

Upgrade of the SVA software application to operate under UNIX 5.1B
Read More

CP0998

Merge BSCP026 and BSCP526 to create new TA BSCP
Read More

CP0997

Inconsistencies between the CRA, URS and BSCPs
Read More

CP0996

Amendment to BSCP06
Read More

CP0995

Replacement for Workaround W018
Read More

CP0994

Improvements to the BMRS Help Screens
Read More

CP0993

Removal of business and working day definitions
Read More

CP0992

Provision of Site Technical Details by the Distribution Business to the Meter Operator Agent on a Change of Measurement Class
Read More

CP0991

MDD Error - MTC LLFC SSC Combinations Screen
Read More

CP0990

Rectification of EAC/AA Calculator Issues
Read More

CP0989

Revision to BSCP14 to bring it in line with the BSC.
Read More

CP0988

Performing Data Estimations Post SF Run
Read More

CP0987

ECVAA URS - Amend Timescales
Read More

CP0986

Amendments to BSCP38
Read More

CP0985

Obligation on LDSO
Read More

CP0984

Addition of Processes in BSCP515 to update the National Measurement Transformer Error Statement
Read More

CP0983

Inclusion of new approved meter types BSCP601
Read More

CP0982

Inconsistency within BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS
Read More

CP0981

Consistency change with MRA relating to timescale for Supplier registration in Supplier Meter Registration Service
Read More

CP0980

Use of Sub-kWh Values in Meter Register Readings
Read More

CP0979

Addition of the Pilot Metercom
Read More

CP0978

Security access meter passwords
Read More

CP0977

Upgrade of NHHDA and EAC/AA software applications to Oracle 9i
Read More

CP0976

BMRS System Updates
Read More

CP0975

Removal of 'Permit Notification Rejection Flag' references
Read More

CP0974

Full review of BSCP65
Read More

CP0973

Extension of Parameters of Party Name field
Read More

CP0972

Review of BSCP71
Read More

CP0971

Removal of BSCP07
Read More

CP0970

Amendment to BSCP31 to remove reference to the P&SA
Read More

CP0969

Change to the SVA Data Catalogue to state that all relevant fields within data flows should be completed.
Read More

CP0968

Addition of an 'Event Indicator' to the D0155
Read More

CP0967

Addition of an 'Event Indicator' to the D0149 and D0150
Read More

CP0966

D0235 Exception reporting - BSCP503, section 4.3
Read More

CP0965

Superfluous reporting of D0095 exceptions combined with an E01 exception following a CoS
Read More

CP0964

Inclusion of BSCP06 form for CDCA-I038 flows
Read More

CP0963

Provision of Facility in ECVAA for Defaulting BSC Party
Read More

CP0962

Amend Registration Reports to include BM Unit Info
Read More

CP0961

New validation rules for the MDD application
Read More

CP0960

NHHDC Validation on Reading Dates
Read More

CP0959

UKPX MIDP 2 Hour Blocks
Read More

CP0958

Enhancements to BSCP28
Read More

CP0957

Information Relating to the Changing Energisation Status
Read More

CP0956

Resolution of Inconsistency Over Presentation of NGC weekly forecasts
Read More

CP0955

Further definition of Timescales in BSCP514 ‘SVA Meter Operation for Metering Systems Registered in SMRS
Read More

CP0954

Inconsistency Over Presentation of NGC weekly forecasts
Read More

CP0953

Control over affirmation of metering system details (D0052)
Read More

CP0952

Clarification of Pre-Payment Meter reading Obligations
Read More

CP0951

Changes and Clarification to HHDA defaulting rules
Read More

CP0950

Removal of Redundant Flows From MDD
Read More

CP0949

PAF Review - Updates to BSCP535 (Tech Assurance)
Read More

CP0948

Upgrade to Oracle 8.1.7.4 for EAC/AA software
Read More

CP0947

Removal of References to Sending D0281 (BSCP508 & SVA Data Catalogue)
Read More

CP0946

Inconsistency in the reporting of Metering Technical Detail
Read More

CP0945

Addition of "Final Initial Settlement Run" into BSCP01
Read More

CP0944

Interconnector Administrator Data Flows
Read More

CP0943

Amendment to BSCP20
Read More

CP0942

Minor Corrections to BSCP507 and BSCP508
Read More

CP0941

Add GSP Group information to the Supplier Agent appointment data flows and define new appointment rejection code value
Read More

CP0940

Clarifications in BSCP02 and BSCP20
Read More

CP0939

Clarification of NHHDC obligation to pass on EAC/AA data
Read More

CP0938

Incorrect footnote reference in BSCP504 3.3.10.2
Read More

CP0937

Operational Change to the Pool Application.
Read More

CP0936

Resolution of inconsistencies between MO & DC data
Read More

CP0935

Operational Review of BSCP42 (Business Continuity)
Read More

CP0934

Change to listing of failed instructions in the NHHDA system
Read More

CP0933

NHHDA and EAC/AA Systems – Management of System Security
Read More

CP0932

Invalid Supplier Hubs
Read More

CP0931

Distinction between Data Retrieval and Data Processing within Data Collector Role
Read More

CP0930

DC TO DA Market Indicator (P0056001)
Read More

CP0929

Remove Performance Reports from ISRA software and products
Read More

CP0928

Remote NHH Data Collection.
Read More

CP0927

Governance of Change of Supplier disputes
Read More

CP0926

Provision of Current & Voltage Transformer Certificates
Read More

CP0925

The Timing and Frequency of Meter Readings from Prepayment M
Read More

CP0924

Missing requirement on data collectors to notify Suppliers
Read More

CP0923

Operational Review of BSCP509 - Change to Market Domain Data
Read More

CP0922

Clarification of use of data by NHHDC
Read More

CP0921

NGC Notification Processing of MIL/MEL Messages
Read More

CP0920

Distribution Line Loss Factors for new LLFC
Read More

CP0919

Generation Line Loss Factors
Read More

CP0918

Verification of authorised signatures by the FAA
Read More

CP0917

Reporting of upheld Trading Disputes on the BMRS
Read More

CP0916

Timing of the SAAI006 flow from the IA
Read More

CP0915

Processing of late and revised SAA I006 files from IA
Read More

CP0914

BSCP504 and SVA DC inconsistency
Read More

CP0913

Clarification of AA / EAC data to be sent by the NHHDC
Read More

CP0912

Changes to Half Hourly Meter Technical Details - D0268.
Read More

CP0911

Minor correction to ECVAA URS F005 and F006
Read More

CP0910

Withdrawal of Meter Readings Post-Final Reconciliation
Read More

CP0909

Deemed Reads where Initial Reads invalid or unattainable
Read More

CP0908

NHH New Connections Sequences.
Read More

CP0907

Security concerns surrounding use of Oracle SYS user
Read More

CP0906

Revision to the Minimum Registration Period
Read More

CP0905

Derivation and validation of EACs
Read More

CP0904

Change to SVA Data Catalogue flow D0030
Read More

CP0903

Incorrect reference in BSCP531
Read More

CP0902

Revision to the Minimum Registration Period (CRA, CMRS)
Read More

CP0901

Unix 5.1 upgrade
Read More

CP0900

Change of address in BSCP601 ‘Metering Protocol Approval and Compliance Testing’
Read More

CP0899

Changes to the Supplier Volume Allocation Meter Advance Reconciliation Requirements in the Code Subsidiary Documents
Read More

CP0898

Provision of Instruction Failure Information to Supplier
Read More

CP0897

Clarifications are required to changes made to the BMRA URS and the SAA URS when implementing P18A and P72.
Read More

CP0896

Amendment to BSCP75 'Registration of Meter Aggregation Rules for Volume Allocation Units' to indicate when Aggregation Rules are being submitted as part of a Meter Registration Transfer
Read More

CP0895

Clarifications to BSCP502 'Half Hourly Data Collection for SVA Metering Systems Registered in SMRS' in respect of Proving Tests
Read More

CP0894

Erroneous Registration and Change of Agent
Read More

CP0893

Changes to the PAB Escalation Cycle in BSCP534
Read More

CP0892

Changes to the flagging of Actual and Estimated Data by the Half Hour Data Aggregator
Read More

CP0891

Upgrade to Oracle 8.1.7.4 for NHHDA software
Read More

CP0890

Clarification of use of data from a previous appointment by NHHDC
Read More

CP0889

Revision to the ‘TA2000’ and ‘NHH Agent Competition’ text within BSCP511 ‘Entry Process - Supplier Meter Registration Service and BSCP512 ‘Entry Processes - Supplier’
Read More

CP0888

ECVNA Authorisation Terminations Effective on Receipt
Read More

CP0887

Update to BSCP 508 File - Re-send Requests
Read More

CP0886

ECVNA and MVRNA Authorisation Request and Key Change Request Automation
Read More

CP0885

ECVNA Authorisation Terminations Effective on Receipt - Enduring Solution
Read More

CP0884

ECVNA Authorisation Terminations Effective on Receipt - Interim Solution
Read More

CP0883

Revise staff availability hours for SMRS operational enquiries
Read More

CP0882

Populating the Energisation Status in the D0055 where the instruction type is SP04
Read More

CP0881

Provision of SAA-I014 Variant 2 (S0142) to BSC Parties
Read More

CP0880

Transfer of reading history following a change of Profile Class without a reading.
Read More

CP0879

Increase the field size of the Meter Id (Serial Number) in the SVA Data Catalogue Volume 2
Read More

CP0878

Removal of Requirement in BSCP71 to give notification of superseded ECVNA/MVRNA Authorisations
Read More

CP0877

Removal of the Notification Agent Forward Contract Report Sub-flow 2 from the ECVAA Reporting Requirements
Read More

CP0876

Resolution of internal BMRA discrepancies - forecast National Demand Surplus
Read More

CP0875

SVA Data Catalogue P0206 Data Item Omission
Read More

CP0874

Include the ‘Meter Type’ data item within the BSC SVA Data Catalogue.
Read More

CP0873

Changes to the Half Hourly Data Estimation Requirements within the Code Subsidiary Documents
Read More

CP0872

Comprehensive changes to D0268 ‘Half Hourly Meter Technical Details’.
Read More

CP0871

Operational Review of BSCP40 (Change Management)
Read More

CP0870

Reporting of GC and DC values for each BM Unit in a CRA Report
Read More

CP0869

Inclusion of Credit Assessment QCE in ECVAA I-014 Report for a Parties Production and Consumption Account
Read More

CP0868

Requirement for NHH Data Collector to provide latest EAC to new NHH Data Aggregator on change of NHHDA
Read More

CP0867

Logging and Performance Monitoring version 2.30
Read More

CP0866

Pool Application version 1.80
Read More

CP0865

BSCP68 Clarification
Read More

CP0864

Indication of Production/Consumption Status of BM Units within S0142 Report issued to BSC Parties
Read More

CP0863

Inconsistency between the ECVAA Service Description, URS and BSC
Read More

CP0862

Error in BSCP501
Read More

CP0861

SVA Data Catalogue Volume 2 Data Item Units of Measure discrepancy
Read More

CP0860

Clarification of the use of D0150 'NHH Meter Technical Details' in PSL110 'SVA Meter Operation
Read More

CP0859

Incorrect reference in BSCP531
Read More

CP0858

Inclusion of Energy Indebtedness data within ECVAA-I014 Report issued to BSC Parties
Read More

CP0857

Changes required to BSCP28 to allow for the approval of CVA Line Loss Factors (LLFs) in less than 40WD when required to complete other processes
Read More

CP0856

Resolution of internal BMRA discrepancies - forecast National Demand Surplus
Read More

CP0855

Processing of MIL/MEL Messages in Sequence Number Order by BMRS
Read More

CP0854

Provision of a new Balancing and Settlement Code Procedure (BSCP) covering Meter Operator Agent processes for Supplier Volume Allocation (SVA) Metering Systems
Read More

CP0853

Inclusion of Credit Assessment QCE in ECVAA I-014 Report for a Parties Production and Consumption Account and Reporting of GC and DC values for each BM Unit in a CRA Report
Read More

CP0852

Amendments to BSCPs to reflect the terminology used in Annex S-1 of the Code
Read More

CP0851

Update to forms in BSCP536 (Supplier Liquidated Damages) to provide additional detail to BSC Parties
Read More

CP0850

Creation of exception log in SVAA software for timestamp errors in D0277 Flow
Read More

CP0849

SVAA National Service Desk Severity Levels
Read More

CP0848

Logging and Performance release 2.21
Read More

CP0847

MDD Release 5.2
Read More

CP0846

BSCP41 - Report, Requests and Authorisation
Read More

CP0845

PARMS - Correction To LD Reports
Read More

CP0844

Correcting Swapped Registers on SVA Multi-Rate Meters
Read More

CP0843

Modification to BMRA Web Site to Support Windows XP
Read More

CP0842

Revision to Non-Half Historical Data Transfer Requirements
Read More

CP0841

Substituted metered data in the CDCA I012 'Raw Metered Data Report'
Read More

CP0840

Amendments to the IDD- Part 1. (Version 4.7)
Read More

CP0839

Amendment to ECVNA Authorisation Termination Request Form BSCP71/03
Read More

CP0838

Inconsistencies between the use of D0139 in BSCP 502 'Half Hourly Data Collection for SVA Metering Systems Registered in SMRS' and MRA Data Transfer Catalogue (DTC)
Read More

CP0837

Introduction of the use of electronic signatures in BSCP509
Read More

CP0836

Update of Supplier Meter Registration System (SMRS) database by Public Distribution System Operator (PDSO) / Supplier
Read More

CP0835

Upgrade to UNIX 5 for ISRA/ SVAA software
Read More

CP0834

Dependency of Inter-Agent Transfers on D0151 (Termination Of Appointment)
Read More

CP0833

Revise three of the Serials in PSL110 'SVA Meter Operation'
Read More

CP0832

Resolution of Defects in the IDD
Read More

CP0831

Amend ‘Meter Type’ definition where a pre-payment meter is used as a credit meter.
Read More

CP0830

Service Description updates to reflect Code changes between v1.0 and v1.1 relating to Contingency Provisions and Supplier of Last Resort
Read More

CP0829

Allow Effective Date of CVA Line Loss Factors to be the same as the date of ISG approval.
Read More

CP0828

New Metering Code of Practice
Read More

CP0827

Clarifications to the coincident Change of Supplier and Measurement Class from a Non Half Hourly to a Half Hourly SVA Metering System Process
Read More

CP0826

Reconciliation of Supplier Meter Operator Agent Mismatches
Read More

CP0825

Provision of Metering System Energisation Status to the Half-Hourly Data Collector (HHDC) for new appointments
Read More

CP0824

Housekeeping change to BSCP536
Read More

CP0823

Housekeeping change to BSCP534
Read More

CP0822

Housekeeping change to BSCP533
Read More

CP0821

Improvements to Central Volume Allocation Proving Test Requirements
Read More

CP0820

Enhancements to a number of Unmetered Supplies Processes
Read More

CP0819

Amend the SVAA Software to Improve Performance Relating to the Selection of Default Data During a SSR Run
Read More

CP0818

Provision of Metering System Energisation Status (ES) to the Half Hourly Data Collector (HHDC) for new appointments
Read More

CP0817

Reconciliation of Supplier Meter Operator Agent Appointment Mismatches
Read More

CP0816

Provide half-hourly / non half-hourly SVA data split by BM Unit to National Grid
Read More

CP0815

Restructuring of ISRA Flat Files
Read More

CP0814

Allow Amendments to ISRA Calendar
Read More

CP0813

Amend the SVAA Load Data Files screen to display the previous and current day's failed files
Read More

CP0812

Improvements to SVAA LLFC Closure Performance When Loading MDD Files
Read More

CP0811

Clarify the timescales associated with steps 3.2.5.6 and 3.2.5.7 within BSCP550
Read More

CP0810

Amend the text within Appendix 4.1 of BSCP502 relating to the use of Consumption Data
Read More

CP0809

Removal of PDSO's obligation to issue D0265 flows to Suppliers and HHDAs
Read More

CP0808

Changes to the Software Maintenance Service (SSL370)
Read More

CP0807

Additional Multiplier Field in the D0268 ' Half Hour Meter Technical Details'
Read More

CP0806

Changes to the SVA Data Catalogue
Read More

CP0805

Amendment to BSCP502 - inclusion of the D0275 dataflow
Read More

CP0804

Enhance D0268 'Half Hourly Meter Technical Details' within the BSC SVA Data Catalogue in relation to removed meters
Read More

CP0803

Missing requirement on Suppliers to address long term or repeatedly failing instructions.
Read More

CP0802

Amendment to BSCP502 - inclusion of the D0275 dataflow
Read More

CP0801

Inappropriate date conversion during data estimation in BSCP502
Read More

CP0800

Mandatory Full Refreshes
Read More

CP0799

Amendments to BSCP504
Read More

CP0798

Changes to the SVA Data Catalogue
Read More

CP0797

Provide a full flow for the RF (Final Reconciliation) run of the SAA I014 Flow 2 System Operator
Read More

CP0796

BSCP 68 and CRA and CDCA Service Descriptions.
Read More

CP0795

Meter Readings failing NHHDC Validation
Read More

CP0794

Removal of requirement for CT certificates for LV CTs
Read More

CP0793

Meter Readings failing NHHDC Validation
Read More

CP0792

Add the MOA as a recipient of D0148 'Notification of Change to Other Parties' dataflow for a change of MOA to the relevant Code Subsidiary Documents
Read More

CP0791

Notification of SMRS Refreshes
Read More

CP0790

Distribution of Supplier Purchase Matrix (D0041) files to Suppliers
Read More

CP0789

Enhancements to the Validation of Non Half Hourly (NHH) Metering Data in BSCP504 and PSL120
Read More

CP0788

Definition of new Supplier Volume Allocation (SVA) Manual Data Flow
Read More

CP0787

Enhancements to Instruction File Processing within the relevant Code Subsidiary Documents
Read More

CP0786

Minor Clarifications to BSCP507
Read More

CP0785

Minor clarification to SSL330 'National Support Services'
Read More

CP0784

Improvement to process relating to Metering System Proving Tests
Read More

CP0783

Minor Enhancements to BSCP501 'Supplier Meter Registration Service'
Read More

CP0782

Amendments and Clarifications to BSCP15 for the CDCA Improvement Project
Read More

CP0781

Amendments and Clarifications to BSCP75 for the CDCA Improvement Project
Read More

CP0780

Amendments and Clarifications to BSCP20 and BSCP06 for the CDCA Improvement Project
Read More

CP0779

Clarification to the proving of Half Hourly Metering Systems in BSCP502
Read More

CP0778

Inclusion of approved CRs in BSCP504 v4.0
Read More

CP0777

Alterations to FAA Documentation to meet four BSC requirements
Read More

CP0775

Enhanced validation within Central Registration Agent (CRA)
Read More

CP0774

Definition of new SVA Manual Data Flow
Read More

CP0773

Change to return address in forms F601/03 and F601/05 of BSCP 601 'Metering Protocol Approval and Compliance Testing'
Read More

CP0772

Enhance D0268 ‘Half Hourly Meter Technical Details’ within the Code Subsidiary Documents.
Read More

CP0771

Modify the timescale associated with the provision of the Supplier Meter Registration Service (SMRS) within the Code Subsidiary Documents.
Read More

CP0770

Corrections to SVA Party Service Lines PSL110, 120, 130 and 140
Read More

CP0769

Improved 'Manage Instruction Files' and 'Browse File Loading Statuses'
Read More

CP0768

Clarification of the correct generation of deemed D0086 Meter Readings by NHH Data Collectors
Read More

CP0767

Modification to timesteps in BSCP28 to align them with timesteps in BSCP68
Read More

CP0766

Minor documentation change to BSCP501
Read More

CP0765

Introduce two new MTC's to uniquely identify actual MSIDs separately from pseudo MSIDs for the Shared SVA Meter Arrangement process.
Read More

CP0764

Publication of updated Appendices 3.2 'Compliance Test List' and 3.3 'Protocol Approval List' from BSCP 601 'Metering Protocol Approval and Compliance Testing' on the ELEXON website.
Read More

CP0763

Identify Prepayment Meters and remove erroneous data items from the D0150 'Non Half Hourly Meter Technical Details' dataflow
Read More

CP0762

Meter Advance Reconciliation Results to PDSOs (BSCP05 & BSCP502)
Read More

CP0761

BSCP15 Housekeeping change
Read More

CP0760

Identification of Prepayment Meters within the D0150 'Non Half Hourly Meter Technical Details' dataflow
Read More

CP0759

Inconsistencies with estimates based on actual HH data more than one month before or after the period of required estimation
Read More

CP0758

Improvements to estimation and validation techniques defined in BSCP 502
Read More

CP0757

Missing Timescale in PSL110 Section 5.3.2
Read More

CP0756

Use of email as an alternative to Authorised Signatures in requests to CRA and CDCA
Read More

CP0755

Enhanced ECVAA Reporting
Read More

CP0754

Correction of Defect in SAA-I014 Flow 2 Report - Inclusion of all information that has changed between settlement runs (particularly data that has changed from non-zero to zero)
Read More

CP0753

Improvements to the Metering Registration Process
Read More

CP0752

Clarify the NHH Deemed Reading Rules at Final Reconciliation
Read More

CP0751

Amendments and Clarifications to BSCP03 for the CDCA Improvement Project
Read More

CP0750

Amendments to BSCP301
Read More

CP0749

Formalising confirmation of Exempt Export BM Unit Status
Read More

CP0748

Change to BCSP 11 to enable use of email to raise disputes
Read More

CP0747

Estimation of Reactive Metering Data
Read More

CP0746

Introduction of a more efficient D0265 (Line Loss Factor Data File) data flow format
Read More

CP0745

Assignment of CALF values to new BMU Units
Read More

CP0744

Notice Period for when Category 1 non-compliance reminder notices are to be sent by TAA
Read More

CP0743

Changes to BSCP 526 and BSCP 26 to address meter operator non-attendance at Technical Assurance Visits.
Read More

CP0742

Removal of the HH Instruction Processing Specification from the SVA Data Catalogue
Read More

CP0741

Removal of the NHH Instruction Processing Specification from the SVA Data Catalogue
Read More

CP0740

BSCCo to notify all organisations of a Party's expulsion or withdrawal from the Code
Read More

CP0739

Services Description Updates to Reflect Code Changes V1.0 To V1.1 Other Than Contingency Provisions and SoLR
Read More

CP0738

Update to Contact Numbers in BSCP42
Read More

CP0737

Volume Restriction on Use of 1kW Advance for Erroneous Transfers
Read More

CP0736

Timing of BMRS Reporting of Indicative Imbalance Prices
Read More

CP0735

Formalisation of Manifest Error Process
Read More

CP0734

Details of Parties that have requested the High Grade Services from BMRA to BSCCo
Read More

CP0733

Reference to Interim Information and Panel approved delays in Reconciliation Runs
Read More

CP0731

Rewrite of BSCP 528 and consolidation of BSCP 528 Addendum
Read More

CP0730

Upgrade to UNIX 5 for NHHDA and EAC/AA software
Read More

CP0729

Inconsistency of Terminology between the BSC, Code Subsidiary Documents (CSD) and BSC Agent
Read More

CP0728

Estimation of Reactive Metering Data
Read More

CP0727

Enhancements to the SVA Balancing Mechanism (BM) Unit registration process defined within the SVA CSDs
Read More

CP0726

Improvements to the Registration BSCP Forms
Read More

CP0725

Enduring Solution for Historical Overwrite in ECVAA
Read More

CP0724

Amendment to BSCP508 "Supplier Volume Allocation Agent"
Read More

CP0723

Automated Meter Reading
Read More

CP0722

Modify NHHDA Instruction Processing specification to include support for 'Special Case' DAA termination.
Read More

CP0721

Enhancements to BSCP509 "Changes to Market Domain Data".
Read More

CP0720

FAA is not adequately involved in the market entry process defined in BSCP65.
Read More

CP0719

Formalise manual interactions between the FAA and the BSCCo relating to Credit Cover.
Read More

CP0718

SVAA SL310 - Defaulting Temperature Data Rules
Read More

CP0717

Automated Meter Reading
Read More

CP0716

Change of tenancy and annual calculation of Load Factors
Read More

CP0715

Clarification of the HHDA data anomaly check specified in BSCP 503, Appendix 4.3 subsection 1.F
Read More

CP0714

Clarifications to Meter Read Audit Trail requirements in Party Agent Service Line (PSL) 120
Read More

CP0713

Correction to ECVAA Service Description - Determination of Minimum Eligible Amount
Read More

CP0712

Making Transmission Company sub-flow of SAA-I014 Reports Available to All Parties - Interim and Enduring Solutions
Read More

CP0711

Generate an exception error if EAC/AA receives NULL Meter Advance in EAC/AA Request File
Read More

CP0710

Changes to the 'Communication Requirements Document' to include the procedure for updating PCSec keys and FTP account passwords
Read More

CP0709

Alignment of the use of Participation Capacity in BSCP65 with the BSC
Read More

CP0708

Inconsistency R014A in NDFC withLogica IDD
Read More

CP0707

Resolution of Inconsistency Between the BMRA and NGC Interface
Read More

CP0706

Provision of SVA Half Hourly Data by accredited sources
Read More

CP0705

Provision of SVA Meter Advance Register data by Suppliers
Read More

CP0704

Re-badging of the SVA Data Catalogue
Read More

CP0703

Credit Default Process
Read More

CP0702

Housekeeping Changes to the Data Marshalling Software
Read More

CP0701

Improved NHHDA application reporting for MSIDs excluded from the SPM because of missing SVA Metering System details
Read More

CP0700

Calculation of Negative Estimates of Annual Consumption (EAC) by the EAC/AA System
Read More

CP0699

Inconsistent approach to the timing of the provision of the routine performance monitoring reports in SVAA SSL300 and SSL310
Read More

CP0698

Enhancements to instruction processing rules within a number of Code Subsidiary Documents
Read More

CP0697

Removal of Inconsistency in BSCP75
Read More

CP0696

Allow the Half Hourly Data Aggregator (HHDA) to apply a default where no consumption data has been provided by the Half Hourly Data Collector (HHDC)
Read More

CP0695

Incorporation of the authorisation of Originators for two SVA Processes within Code Subsidiary Documents
Read More

CP0694

Remove the inconsistency in Party Service Line PSL130 in relation to the amount of data that should be transferred
Read More

CP0693

Allow the Half Hourly Data Aggregator (HHDA) to apply a default where no consumption data has been provided by the Half Hourly Data Collector (HHDC).
Read More

CP0692

Raised from Emergency Fix CP689. Software maintenance to increase array size within code with no change to business functionality
Read More

CP0691

Incorporate revised proving and validation rules in the Half Hourly (HH) Code Subsidiary Documents (CSDs).
Read More

CP0690

Clarifications and improvements to the Unmetered Supplies processes in the Code Subsidiary Documents
Read More

CP0689

Logging Application
Read More

CP0688

Changes to SAA URS for the ECVAA Interim Release and P10 Project.
Read More

CP0687

Changes to DCR BMRA for the ECVAA Interim Release and P10 Sub Project.
Read More

CP0686

Changes to NDFC documents for the ECVAA interim Release P10 Sub Project.
Read More

CP0685

Changes to SAA service description for the ECVAA interim Release and P10 Sub Project.
Read More

CP0684

Changes to the Categories of Market Organisations as defined in the BSCP42
Read More

CP0683

Provision of Estimated Annual Consumptions (EACs) to Public Distribution System Operator (PDSO)
Read More

CP0682

Upgrade to the ISRA/SVAA software to run on the Oracle 8 platform
Read More

CP0681

New Measure for inclusion and modification to existing Measure in Appendix 2 of SVAA SSL300 "Supplier Volume Allocation"
Read More

CP0680

Enhancements to the SVA Supplier / Supplier Agent Standing Data Change Form in BSCP507
Read More

CP0679

Removal of Inconsistency from BSCP0
Read More

CP0678

Inconsistency between BSC Section V and the Reporting Catalogue - Contents of BMRS
Read More

CP0677

Capitalizing of term "meter period value" in SL130
Read More

CP0676

Changes to CoP 3 for HHTAG Recommendations
Read More

CP0670

Changes to CoP 6 for HHTAG Recommendations
Read More

CP0669

HHTAG Recommendations for CoP 7 Version 1
Read More

CP0668

“When” box needs clarifying to explicitly allow for de-appointments at GSP Group
Read More

CP0667

Alterations required to EAC/AA Build
Read More

CP0666

Amendments to AP508
Read More

CP0665

Alterations required to EAC/AA Build
Read More

CP0664

Stage 2 Settlement Supplier / Supplier Agent Standing Data Change Form
Read More

CP0663

NHHDA Archiving Software Defect
Read More

CP0662

Revise timescale associated with SVAA loading the approved LLFs (annual and ad-hoc)
Read More

CP0661

BSCP65 - MDD Updates: Supplier Stops Trading
Read More

CP0660

Amendment to SSL330 "National Support Services" relating to response times (Table 2)
Read More

CP0659

Issues with ISRA Archiving
Read More

CP0658

Amendments to the Acceptance Test Pack for ISRA/SVAA Archiving Project
Read More

CP0657

Amendments to ISRA/SVAA System Management Guide for ISRA/SVAA Archiving Project
Read More

CP0656

Amendments to ISRA/SVAA Operations Guide for ISRA/SVAA Archiving Project
Read More

CP0655

Amendments to ISRA/SVAA Physical Design for ISRA/SVAA Archiving Project
Read More

CP0654

Amendments to ISRA/SVAA Logical Design for ISRA/SVAA Archiving Project
Read More

CP0653

Amendments to SSL320 for ISRA/SVAA Archiving Project
Read More

CP0652

Amendments to ISRA/SVAA URS for ISRA/SVAA ArchivingProject
Read More

CP0651

Amendments to ISRA/SVAA software for ISRA/SVAA Archiving Project
Read More

CP0650

Changes to the Acceptance Test Pack for NHHDA V7.2.0
Read More

CP0649

Changes to NHHDA Instruction Processing Specification
Read More

CP0648

OR3106 - The Special Case DAA is not Validating Correctly
Read More

CP0647

Removing / Mitigating The Effect Of System Balancing Actions In The Imbalance Price Calculations (MP18)
Read More

CP0646

Accreditation of ECVNA and MVRNA Registrations
Read More

CP0645

Incorrect Default Rules for missing DA Data in SSL300
Read More

CP0644

Extension To Selection Criteria for Modification Proposal P10
Read More

CP0643

Modification P10 – Removing De Minimis Acceptances from the Calculation of SBP/SSP
Read More

CP0642

Enduring Process to replace W016 - CRA Registration Details to Elexon
Read More

CP0641

Enduring Process to replace W021 - CRA Registration Details to NGC
Read More

CP0640

Change to CDCA URS
Read More

CP0639

Handling of Missing or Invalid Data (SAA)
Read More

CP0638

HH Estimation Using Physical Meter Readings in Conjunction with Default Profile
Read More

CP0637

Meter Serial Number Field Length (CDCA)
Read More

CP0636

Change to BSCP28
Read More

CP0635

Changes to CRA URS
Read More

CP0634

Replace the term 'Code of Practice Requirement' with the term 'BSCP Requirement'
Read More

CP0633

Bid-Offer records within Settlement Report
Read More

CP0632

Changes to the SAA URS
Read More

CP0631

Amendment to BMRA URS
Read More

CP0630

Changes to BSCP01
Read More

CP0629

Changes to the CDCA URS
Read More

CP0628

Design Deficiency in Non Half Hourly Data Aggregator (NHHDA) Instruction Supersede Logic
Read More

CP0627

Changes to BSCP301
Read More

CP0626

Out of Sequence File Handling
Read More

CP0625

Inconsistencies between the BSC and the BMRA URS
Read More

CP0624

Change to BSCP05
Read More

CP0623

Change to BSCP03
Read More

CP0620

Receipt of CDCA-I050
Read More

CP0619

Amendments to TAA URS
Read More

CP0618

Changes to the CDCA URS
Read More

CP0617

Changes to the Reporting Catalogue to bring it in line with v1.1. of the BSC
Read More

CP0616

Service Levels for the Reporting of data to NGC by Logica
Read More

CP0615

Alignment of the CRA URS with the BSC
Read More

CP0614

BSCP32: Metering Dispensations - Consultation comments
Read More

CP0613

FAA Bad Debt Processing
Read More

CP0612

Changes to the CRA URS
Read More

CP0611

Inconsistencies between the CRA URS and BSCP65
Read More

CP0610

IDD Documentation Errors and Inconsistencies - IDD Document and Spreadsheet - Part 2
Read More

CP0609

BSCP05 Visual Inspection of Metering Systems
Read More

CP0608

Improvements to BSCP509 "Changes to Market Domain Data" raised to supersede NCR267
Read More

CP0607

Error Messaging
Read More

CP0606

Support for PCSec under Windows 2000
Read More

CP0605

UNIX Version of PCSec
Read More

CP0604

Removal of restriction on Polling Interval
Read More

CP0603

PCSec as a Windows NT Service
Read More

CP0602

Three Enhancements for PCSec
Read More

CP0601

Implementation of the Interconnector Error Administrator BM Unit Functionality
Read More

CP0600

BSCCo Ltd as a Recipient of SAA-I014 Sub flow 2
Read More

CP0599

Non Unique ECVN / MVRN Feedback Reports
Read More

CP0598

Procedural problem with BSCP 04
Read More

CP0597

Changes to SAA-I014 to meet NGC's Audit Requirements
Read More

CP0596

Correction to the SAA URS
Read More

CP0595

Suppression of ELEXON Exception Reports
Read More

CP0594

Incorporation of the manual disputes process in CSDs
Read More

CP0593

Interim Initial Settlement Run (CDCA URS)
Read More

CP0592

Inconsistencies between Central Services Software and the NDFC
Read More

CP0591

Availability of Transmission Company SAA-I014 Reports
Read More

CP0590

Design enhancements to the standing data process
Read More

CP0589

BMRA BM Unit Identification
Read More

CP0588

Data Receipt and Validation by the SAA
Read More

CP0587

Inconsistency for Data Retention Requirements
Read More

CP0586

Notification of Files where decryption has failed
Read More

CP0585

BMRA and SAA Data Corrections to Replace W018
Read More

CP0584

BSCP26: Policing of Metering Systems for CVA
Read More

CP0583

Clarification of methods for requesting reports under BSCP41
Read More

CP0582

Update of Logica TAA Service description
Read More

CP0581

Update of Logica SAA Service description
Read More

CP0580

Update of Logica ECVAA Service description
Read More

CP0579

Update of Logica CDCA Service description
Read More

CP0578

Update of Logica CRA Service description
Read More

CP0577

Update of Logica BMRA Service description
Read More

CP0576

Recording of Transmission Los Factors by Settlement Period
Read More

CP0575

Party and Party Agent Authorisations
Read More

CP0574

Payment & Settlement Calendars
Read More

CP0573

Amendment to BSCP71
Read More

CP0572

Inconsistencies between the BSC and BSCP01
Read More

CP0571

Amendments to the ECVAA URS
Read More

CP0570

Aggregation Rule – acknowledgements by CDCA
Read More

CP0569

BSCP20 – Equipment Owners consent
Read More

CP0568

Allocation of BM Units
Read More

CP0567

Inconsistencies in BSCP15 and BSCP20
Read More

CP0566

IDD & BSCP03 - Consistent originator of flow CDCAI013
Read More

CP0565

Inconsistencies within BSCP26
Read More

CP0564

Implementation of short codes for dialling of CVA meters
Read More

CP0563

Inconsistencies in BSCP01 & BSCP03
Read More

CP0562

Inconsistencies in the CDCA URS
Read More

CP0561

Process to Obtain French Interconnector Meter Readings
Read More

CP0560

Handling of BMRA During BM System Operation Outages
Read More

CP0559

Inclusion of Settlements Run Type Info in Aggregated Reports
Read More

CP0558

Removal of Support for D0269 & D0270 version 001 dataflows
Read More

CP0557

Income tax processing within the Funds Transfer System
Read More

CP0556

Participation Capacity Clarification in BSCP65 version 2
Read More

CP0555

Amendments to the SAA URS
Read More

CP0554

Amendments to BSCP301
Read More

CP0553

Amendments to FAA URS
Read More

CP0552

Enduring Process to replace W016 - CRA Registration Details
Read More

CP0551

Enduring Process to replace W006 - P0181 flow to SVAA
Read More

CP0550

Addition of Authentication Processes in BSCP38
Read More

CP0549

Display duration of BMRA System Warning Messages
Read More

CP0548

Default Values and Effective Dates for Line Loss Factors
Read More

CP0547

ECVNA and MVRNA Registration, Authorisation and Termination
Read More

CP0546

Enduring Solution to replace NETA Workaround 001
Read More

CP0545

BSCP07: Standing Data Changes - Consultation comments
Read More

CP0544

Notification and Sealing of Metering Equipment for CVA
Read More

CP0543

BMRA Browser Support
Read More

CP0541

Changes to BMCAEC/BMCAIC
Read More

CP0540

Adequate ECVAA Delay Functionality
Read More

CP0539

Disregard Historic ECV Data for on the Day ECVNs
Read More

CP0538

Release 2 of the New Electricity Arrangements
Read More

CP0537

BMRA Reporting of Historic Market Data
Read More

CP0536

Parameters for Automatically Generated BM Units
Read More

CP0535

ECVAA Functionality for MVRNA and ECVNA Authorisations
Read More

CP0534

Disregard Contract Trading Party during Credit Checking
Read More

CP0533

Clarification of methods for requesting reports under BSCP41
Read More

CP0532

SAA-I014: Denominator Value in Residual Cashflow Reallocation
Read More

CP0531

Incorrect Reference in BSCP 507
Read More

CP0530

Reporting of CALF Values to ELEXON
Read More

CP0529

Entry of Negative CALF Values into CRA
Read More

CP0528

Inconsistency between BSCP15 and BSCP508
Read More

CP0527

IDD Part 1 - Documentation Errors and Inconsistencies
Read More

CP0526

To bring Method of Communication required in line with IDD
Read More

CP0525

To bring Method of Communication required in line with IDD
Read More

CP0524

To bring Method of Communication required in line with IDD
Read More

CP0523

To bring Method of Communication required in line with IDD
Read More

CP0522

To bring Method of Communication required in line with IDD
Read More

CP0521

Inconsistencies between BSCPs and IDD
Read More

CP0520

Resolve the inconsistency on the Credit Level naming convention between the ECVAA specifications/software and the Balancing and Settlement Code. The ECVAA system functionality should be amended to report a Level 1 credit default on breach of 80% Indebtedness and a Level 2 Credit Default on breach of 90% Indebtedness for a Participant. The ECVAA Specifications should be amended where appropriate to reflect this functionality and reporting change. The Balancing and Settlement Code Section M 3.2.1 states that a Level 1 Credit Default occurs when a Participant goes above 80% Indebtedness, Section M 3.3.1 states that a Level 2 Credit Default occurs when a Participant goes above 90% Indebtedness. The ECVAA System Specification (Issue 3.4 section 4.3) states that an ‘Indebtedness Level 1’ occurs when the Participant goes above 90%. The specification also refers to a ‘Level 2 system parameter
Read More

CP0519

Calculation by the ECVAA of a Trading Party’s ‘MEA’
Read More

CP0518

Enhancements to the Non Half Hourly Balancing Mechanism
Read More

CP0517

Multiple Ad-hoc runs to Settle Disputes
Read More

CP0511

CVA Meter Status Reports
Read More

CP0510

SAA and BMRA System Sell and Buy Price Default Rules
Read More

CP0509

BSCP68 - Removal of Metering System Transfer restrictions
Read More

CP0508

Submission of registration details changes to BSCCo
Read More

CP0507

Submission of registration details changes to BSCCo
Read More

CP0506

Incorrect estimated settlement data
Read More

CP0505

Changes to the NGC BSAD Methodology Statement for Mod P3
Read More

CP0504

Logging Application
Read More

CP0503

Ability to change registration details for Party Agents
Read More

CP0502

Correction of qualification procedures
Read More

CP0501

Alignment of NETA Business Process Model with baseline 3.2
Read More

test

Read More

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or